Erete

From energypedia


Back to the Hydropower Sites Database

General Information

Country: Ethiopia
City/Town: District: Bona Kebele: Beshiro Gute
Coordinates (Powerhouse): The following coordinate was not recognized: 6º33’26.8’’N 38º40’8.4’’ E.The following coordinate was not recognized: 6º33’26.8’’N 38º40’8.4’’ E.
Year of Commission:
Basin Name:
Stream Name: Ererte
Developer:
Operator:
Project Status:
Any other uses of the water source:
Contact:
Comment: Robot Electric Users Cooperative/community based cooperative society
Link to Photos:

Technical Information

Power: (kW)
Energy (kWh/a):
Capacity Factor (%):
Penstock Diameter (mm): 400
Penstock Length (m): 42
Penstock Material (m³/s): Mild steal
Maximum Flow of the Penstock (m³/s):
Minimum Flow of the Stream (m³/s):
Head (m):
Turbine Type: cross flow turbine (T-15)
Turbine Manufacturer: SELAM
Generator Type: Synchronous Brushless
Generator Capacity (kW): 42
Generator Manufacturer: MARELLI
Comment: Generator: MARELLI-Brushless Synchronous,1500 rpm, 42 kVA, 33.6 kW, 50 Hz, Efficiency - 89%, 380/440 V(adjustable), 3 phase series STAR

Mini/Island Grid Information

Mini Grid: Yes
Load Control Information:
Connection Type:
Public Lighting:
Length of Transmission Line (m): 2760
Voltage (v):
Transmission Conductor (type) :
Diameter of Conductor (mm²):
Transformer Rating (kVA):
Link to Grid:
S.W.E.R:
Operational Period (Xdays/year):
Comment:

Dam Information

Dam Type:

Dam Construction Material:
Dam Height [m]:
Length of Dam [m]:
Storage Volume of Reservoir (m³):
Flood Storage of Reservoir:
Channel Material:
Comment:

Economic Information

Cost (€):
Donor/Financier & Percentage: GIZ EnDev
Tariff Levels: Flat rate/monthly based per appliance
Connected Households:
Connection Cost (€):
Cost to be Covered by Households (%):
Comment:
Link to Cost Breakdown:


Please find more pictures here: https://energypedia.info/index.php/Ererti_MHP