Gobecho I

From energypedia


Back to the Hydropower Sites Database

General Information

Country: Ethiopia
City/Town: District: Bona
Coordinates (Powerhouse): The following coordinate was not recognized: 6°34’40’’ N, 38°41’50.3’’ E.The following coordinate was not recognized: 6°34’40’’ N, 38°41’50.3’’ E.
Year of Commission:
Basin Name:
Stream Name: Gange
Developer:
Operator: Gobecho Genet Electric users cooperative/Community based cooperative Society
Project Status:
Any other uses of the water source:
Contact:
Comment:
Link to Photos: https://energypedia.info/index.php/MHP_Gobecho_I

Technical Information

Power: (kW) 7
Energy (kWh/a):
Capacity Factor (%):
Penstock Diameter (mm):
Penstock Length (m):
Penstock Material (m³/s):
Maximum Flow of the Penstock (m³/s):
Minimum Flow of the Stream (m³/s):
Head (m):
Turbine Type: cross flow turbine (T-3)
Turbine Manufacturer: SELAM
Generator Type: Synchronous
Generator Capacity (kW): 10kW
Generator Manufacturer:
Comment: A.C. Synchronous Generator/ Power 10 kW, 400 V, 50 Hz, 1500r/min, 3 phase

Mini/Island Grid Information

Mini Grid: Yes
Load Control Information:
Connection Type:
Public Lighting:
Length of Transmission Line (m):
Voltage (v):
Transmission Conductor (type) :
Diameter of Conductor (mm²):
Transformer Rating (kVA):
Link to Grid:
S.W.E.R:
Operational Period (Xdays/year):
Comment:

Dam Information

Dam Type:

Dam Construction Material:
Dam Height [m]:
Length of Dam [m]:
Storage Volume of Reservoir (m³):
Flood Storage of Reservoir:
Channel Material:
Comment:

Economic Information

Cost (€):
Donor/Financier & Percentage: GIZ EnDev
Tariff Levels: Flat rate/monthly based per appliance
Connected Households:
Connection Cost (€):
Cost to be Covered by Households (%):
Comment:
Link to Cost Breakdown:


further information: https://energypedia.info/index.php/File:Fact_sheet_Gobecho.pdf