Difference between revisions of "Micro Hydro Power (MHP) - Ethiopia, Ererte"
From energypedia
***** (***** | *****) m |
***** (***** | *****) m |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
= Overview = | = Overview = | ||
− | + | <u>Location of the '''Micro Hydro Power (MHP)''' site:</u> | |
− | <u>Location of the site:</u> | + | *Country: [[Ethiopia Energy Situation|Ethiopia]] |
− | *Country: Ethiopia | ||
*District: Bona | *District: Bona | ||
*Kebele: Beshiro Gute | *Kebele: Beshiro Gute | ||
*River: Ererte | *River: Ererte | ||
*GPS coordinate: 6º33’26.8’’N 38º40’8.4’’ E | *GPS coordinate: 6º33’26.8’’N 38º40’8.4’’ E | ||
− | |||
<br/> | <br/> | ||
− | |||
= Details = | = Details = | ||
− | |||
The MHP plant Ererte has a capacity of 33 kW and is planned to be inaugurated in September 2011. A total of approximately 200 households will be connected to the plant. The maximum number of potentially connectable households is 700. | The MHP plant Ererte has a capacity of 33 kW and is planned to be inaugurated in September 2011. A total of approximately 200 households will be connected to the plant. The maximum number of potentially connectable households is 700. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
<br/> | <br/> | ||
− | + | ► Click [[:file:Factsheet ererti.pdf|here]] for more information. | |
− | |||
− | |||
− | |||
− | |||
<br/> | <br/> | ||
− | + | *'''Start of Construction: '''August 2009 | |
− | '''Technical Specification:''' | + | *'''Date of Commissioning: '''- |
− | *Canal: Lined stone masonry having a length of 53m | + | *'''Ownership:''' Robot Electric Users Cooperative/community based cooperative society |
− | *Penstock: Mild stell having a diameter of 400mm and a length of 42m/locally manufactured | + | *'''Tariff Structure:''' Flat rate/monthly based per appliance |
− | *Turbine: T-15 cross flow turbine /Manufactured locally | + | *'''Technical Specification:''' |
− | *Generator: MARELLI-Brushless Synchronous,1500 rpm, 42 kVA, 33.6 kW, 50 Hz, Efficiency - 89%, 380/440 V(adjustable), 3 phase series STAR | + | **Canal: Lined stone masonry having a length of 53m |
− | *Grid: Low Voltage distribution with ABC cable and Wooden pole (2.76 km) | + | **Penstock: Mild stell having a diameter of 400mm and a length of 42m/locally manufactured |
− | + | **Turbine: T-15 cross flow turbine /Manufactured locally | |
+ | **Generator: MARELLI-Brushless Synchronous,1500 rpm, 42 kVA, 33.6 kW, 50 Hz, Efficiency - 89%, 380/440 V(adjustable), 3 phase series STAR | ||
+ | **Grid: Low Voltage distribution with ABC cable and Wooden pole (2.76 km) | ||
<br/> | <br/> | ||
− | |||
= Pictures = | = Pictures = | ||
− | {| cellspacing="1" cellpadding="1" border="0 | + | {| cellspacing="1" cellpadding="1" border="0" style="width: 100%" class="FCK__ShowTableBorders" |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | [[File:Ererti | + | | [[File:Ererti Fall.JPG|thumb|left|370px|Ererti Fall|alt=Ererti Fall.JPG]] |
− | | [[File: | + | | [[File:Ererti MHP site.JPG|thumb|left|370px|Ererti MHP site|alt=Ererti MHP site.JPG]] |
|- | |- | ||
− | | | + | | [[File:Ererti MHP weir ,Intake and canal.JPG|thumb|left|370px|Ererti MHP weir, intake and canal|alt=Ererti MHP weir ,Intake and canal.JPG]] |
− | | Locally Manufactured T-15 Turbine | + | | [[File:Locally Manufactured T-15 Turbine.JPG|thumb|left|370px|Locally manufactured T-15 turbine|alt=Locally Manufactured T-15 Turbine.JPG]] |
|} | |} | ||
− | |||
<br/> | <br/> | ||
− | |||
= Further Information = | = Further Information = | ||
+ | *[[Portal:Hydro|Hydro Portal on energypedia]] | ||
+ | *[[Ethiopia Energy Situation|Ethiopia Energy Situation]] | ||
+ | *[[Micro Hydro Power (MHP) - Ethiopia, Gobecho I|Micro Hydro Power (MHP) - Ethiopia, Gobecho I]] | ||
+ | *[[Micro Hydro Power (MHP) - Ethiopia, Gobecho II|Micro Hydro Power (MHP) - Ethiopia, Gobecho II]] | ||
+ | *[[Micro Hydro Power (MHP) - Ethiopia, Hagara Sodicha|Micro Hydro Power (MHP) - Ethiopia, Hagara Sodicha]] | ||
+ | <br/> | ||
= References = | = References = | ||
− | |||
<references /> | <references /> | ||
[[Category:Hydro]] | [[Category:Hydro]] | ||
+ | [[Category:Micro_Hydro]] | ||
[[Category:Ethiopia]] | [[Category:Ethiopia]] |
Latest revision as of 15:33, 12 January 2015
Overview
Location of the Micro Hydro Power (MHP) site:
- Country: Ethiopia
- District: Bona
- Kebele: Beshiro Gute
- River: Ererte
- GPS coordinate: 6º33’26.8’’N 38º40’8.4’’ E
Details
The MHP plant Ererte has a capacity of 33 kW and is planned to be inaugurated in September 2011. A total of approximately 200 households will be connected to the plant. The maximum number of potentially connectable households is 700.
► Click here for more information.
- Start of Construction: August 2009
- Date of Commissioning: -
- Ownership: Robot Electric Users Cooperative/community based cooperative society
- Tariff Structure: Flat rate/monthly based per appliance
- Technical Specification:
- Canal: Lined stone masonry having a length of 53m
- Penstock: Mild stell having a diameter of 400mm and a length of 42m/locally manufactured
- Turbine: T-15 cross flow turbine /Manufactured locally
- Generator: MARELLI-Brushless Synchronous,1500 rpm, 42 kVA, 33.6 kW, 50 Hz, Efficiency - 89%, 380/440 V(adjustable), 3 phase series STAR
- Grid: Low Voltage distribution with ABC cable and Wooden pole (2.76 km)
Pictures
Further Information
- Hydro Portal on energypedia
- Ethiopia Energy Situation
- Micro Hydro Power (MHP) - Ethiopia, Gobecho I
- Micro Hydro Power (MHP) - Ethiopia, Gobecho II
- Micro Hydro Power (MHP) - Ethiopia, Hagara Sodicha