Difference between revisions of "Micro Hydro Power (MHP) - Ethiopia, Ererte"
From energypedia
***** (***** | *****) m |
***** (***** | *****) m |
||
Line 2: | Line 2: | ||
= Overview = | = Overview = | ||
− | <u>Location of the site:</u> | + | <u>Location of the '''Micro Hydro Power (MHP)''' site:</u> |
− | *Country: Ethiopia | + | *Country: [[Ethiopia_Energy_Situation|Ethiopia]] |
*District: Bona | *District: Bona | ||
*Kebele: Beshiro Gute | *Kebele: Beshiro Gute | ||
Line 15: | Line 15: | ||
The MHP plant Ererte has a capacity of 33 kW and is planned to be inaugurated in September 2011. A total of approximately 200 households will be connected to the plant. The maximum number of potentially connectable households is 700. | The MHP plant Ererte has a capacity of 33 kW and is planned to be inaugurated in September 2011. A total of approximately 200 households will be connected to the plant. The maximum number of potentially connectable households is 700. | ||
− | |||
− | |||
− | + | ► Click [[:file:Factsheet ererti.pdf|here]] for more information. | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | '''Technical Specification:''' | + | *'''Start of Construction: '''August 2009 |
− | *Canal: Lined stone masonry having a length of 53m | + | *'''Date of Commissioning: '''- |
− | *Penstock: Mild stell having a diameter of 400mm and a length of 42m/locally manufactured | + | *'''Ownership:''' Robot Electric Users Cooperative/community based cooperative society |
− | *Turbine: T-15 cross flow turbine /Manufactured locally | + | *'''Tariff Structure:''' Flat rate/monthly based per appliance |
− | *Generator: MARELLI-Brushless Synchronous,1500 rpm, 42 kVA, 33.6 kW, 50 Hz, Efficiency - 89%, 380/440 V(adjustable), 3 phase series STAR | + | *'''Technical Specification:''' |
− | *Grid: Low Voltage distribution with ABC cable and Wooden pole (2.76 km) | + | **Canal: Lined stone masonry having a length of 53m |
+ | **Penstock: Mild stell having a diameter of 400mm and a length of 42m/locally manufactured | ||
+ | **Turbine: T-15 cross flow turbine /Manufactured locally | ||
+ | **Generator: MARELLI-Brushless Synchronous,1500 rpm, 42 kVA, 33.6 kW, 50 Hz, Efficiency - 89%, 380/440 V(adjustable), 3 phase series STAR | ||
+ | **Grid: Low Voltage distribution with ABC cable and Wooden pole (2.76 km) | ||
<br/> | <br/> | ||
Line 58: | Line 53: | ||
= Further Information = | = Further Information = | ||
+ | |||
+ | *[[Portal:Hydro|Hydro Portal on energypedia]] | ||
+ | *[[Ethiopia_Energy_Situation|Ethiopia Energy Situation]] | ||
+ | *[[Micro_Hydro_Power_(MHP)_-_Ethiopia,_Gobecho_I|Micro Hydro Power (MHP) - Ethiopia, Gobecho I]] | ||
+ | *[[Micro_Hydro_Power_(MHP)_-_Ethiopia,_Gobecho_II|Micro Hydro Power (MHP) - Ethiopia, Gobecho II]] | ||
+ | *[[Micro_Hydro_Power_(MHP)_-_Ethiopia,_Hagara_Sodicha|Micro Hydro Power (MHP) - Ethiopia, Hagara Sodicha]] | ||
+ | |||
+ | |||
= References = | = References = | ||
Line 63: | Line 66: | ||
<references /> | <references /> | ||
+ | [[Category:Ethiopia]] | ||
+ | [[Category:Micro_Hydro]] | ||
[[Category:Hydro]] | [[Category:Hydro]] | ||
− |
Revision as of 11:36, 30 September 2014
Overview
Location of the Micro Hydro Power (MHP) site:
- Country: Ethiopia
- District: Bona
- Kebele: Beshiro Gute
- River: Ererte
- GPS coordinate: 6º33’26.8’’N 38º40’8.4’’ E
Details
The MHP plant Ererte has a capacity of 33 kW and is planned to be inaugurated in September 2011. A total of approximately 200 households will be connected to the plant. The maximum number of potentially connectable households is 700.
► Click here for more information.
- Start of Construction: August 2009
- Date of Commissioning: -
- Ownership: Robot Electric Users Cooperative/community based cooperative society
- Tariff Structure: Flat rate/monthly based per appliance
- Technical Specification:
- Canal: Lined stone masonry having a length of 53m
- Penstock: Mild stell having a diameter of 400mm and a length of 42m/locally manufactured
- Turbine: T-15 cross flow turbine /Manufactured locally
- Generator: MARELLI-Brushless Synchronous,1500 rpm, 42 kVA, 33.6 kW, 50 Hz, Efficiency - 89%, 380/440 V(adjustable), 3 phase series STAR
- Grid: Low Voltage distribution with ABC cable and Wooden pole (2.76 km)
Pictures
Ererte waterfall |
Ererte MHP site |
Ererte intake and canal |
Locally Manufactured T-15 Turbine |
Further Information
- Hydro Portal on energypedia
- Ethiopia Energy Situation
- Micro Hydro Power (MHP) - Ethiopia, Gobecho I
- Micro Hydro Power (MHP) - Ethiopia, Gobecho II
- Micro Hydro Power (MHP) - Ethiopia, Hagara Sodicha