Difference between revisions of "Micro Hydro Power (MHP) - Ethiopia, Gobecho II"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
m
Line 2: Line 2:
 
= Overview =
 
= Overview =
  
<u><u>Location of the '''Micro Hydro Power (MHP)''' site:</u></u>
+
<u>Location of the '''Micro Hydro Power (MHP)''' site:</u>
*Country: [[Ethiopia_Energy_Situation|Ethiopia]]
+
*Country: [[Ethiopia Energy Situation|Ethiopia]]
 
*District: Bona
 
*District: Bona
 
*River: Gange
 
*River: Gange
Line 19: Line 19:
 
*'''Start of construction: '''22/09/2009
 
*'''Start of construction: '''22/09/2009
 
*'''Date of Commissioning:''' -
 
*'''Date of Commissioning:''' -
 
 
 
*'''Ownership / Operation Modell: '''Gobecho Genet Electric Users Cooperative/community based cooperative society
 
*'''Ownership / Operation Modell: '''Gobecho Genet Electric Users Cooperative/community based cooperative society
 
*'''Tariff structure: '''Flat rate/monthly based per appliance
 
*'''Tariff structure: '''Flat rate/monthly based per appliance
Line 30: Line 28:
 
= Pictures =
 
= Pictures =
  
{| cellspacing="1" cellpadding="1" border="0" style="width: 100%" class="FCK__ShowTableBorders"
+
{| cellspacing="1" cellpadding="1" border="0" class="FCK__ShowTableBorders" style="width: 100%"
 
|-
 
|-
 
| style="width: 440px" | [[File:Bild 261.jpg|left|200px|Bild 261.jpg|alt=Bild 261.jpg]]
 
| style="width: 440px" | [[File:Bild 261.jpg|left|200px|Bild 261.jpg|alt=Bild 261.jpg]]
Line 50: Line 48:
  
 
*[[Portal:Hydro|Hydro Portal on energypedia]]
 
*[[Portal:Hydro|Hydro Portal on energypedia]]
*[[Ethiopia_Energy_Situation|Ethiopia Energy Situation]]
+
*[[Ethiopia Energy Situation|Ethiopia Energy Situation]]
*[[Micro_Hydro_Power_(MHP)_-_Ethiopia,_Gobecho_I|Micro Hydro Power (MHP) - Ethiopia, Gobecho I]]
+
*[[Micro Hydro Power (MHP) - Ethiopia, Gobecho I|Micro Hydro Power (MHP) - Ethiopia, Gobecho I]]
*[[Micro_Hydro_Power_(MHP)_-_Ethiopia,_Ererte|Micro Hydro Power (MHP) - Ethiopia, Ererte]]
+
*[[Micro Hydro Power (MHP) - Ethiopia, Ererte|Micro Hydro Power (MHP) - Ethiopia, Ererte]]
*[[Micro_Hydro_Power_(MHP)_-_Ethiopia,_Hagara_Sodicha|Micro Hydro Power (MHP) - Ethiopia, Hagara Sodicha]]
+
*[[Micro Hydro Power (MHP) - Ethiopia, Hagara Sodicha|Micro Hydro Power (MHP) - Ethiopia, Hagara Sodicha]]
 
 
  
 +
<br/>
  
 
= References =
 
= References =
Line 61: Line 59:
 
<references />
 
<references />
  
 +
[[Category:Ethiopia]]
 +
[[Category:Micro_Hydro]]
 
[[Category:Hydro]]
 
[[Category:Hydro]]
[[Category:Micro_Hydro]]
 
[[Category:Ethiopia]]
 

Revision as of 11:28, 30 September 2014

Overview

Location of the Micro Hydro Power (MHP) site:

  • Country: Ethiopia
  • District: Bona
  • River: Gange
  • GPS Coordinates: 6º34’39.7’’N 38º41’50’’E


Details

The MHP power plant Gobecho II has a capacity of 34 kW and is planned to be inaugurated in September 2011. Current estimations show that approximately 200 households will be connected to the plant. The maximum number of households that could be supplied is estimated to be 700 (given that no public facilities such as schools and health centers are connected).

► For more information click here.


  • Start of construction: 22/09/2009
  • Date of Commissioning: -
  • Ownership / Operation Modell: Gobecho Genet Electric Users Cooperative/community based cooperative society
  • Tariff structure: Flat rate/monthly based per appliance
  • Turbine: Cross- flow T14 D300 HeksaHydro, Efficiency --76%
  • Generator: Synchronous Alternator, 1450rpm, 60kVA, 3 phase, cos phi - 0.8, 50 Hz, insulation class-F, Brand Matari, origin China


Pictures

Bild 261.jpg
Gobecho II powerhouse.jpg
Gobecho II waterfall Gobecho II powerhouse (under construction)
Gobecho II Fall (2).jpg
Gobecho II waterfall


Further Information


References