Difference between revisions of "Micro Hydro Power (MHP) - Ethiopia, Gobecho II"
From energypedia
***** (***** | *****) m |
***** (***** | *****) m |
||
(3 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
= Overview = | = Overview = | ||
− | + | <u>Location of the '''Micro Hydro Power (MHP)''' site:</u> | |
− | <u>Location of the site:</u> | + | *Country: [[Ethiopia Energy Situation|Ethiopia]] |
− | *Country: Ethiopia | ||
*District: Bona | *District: Bona | ||
*River: Gange | *River: Gange | ||
*GPS Coordinates: 6º34’39.7’’N 38º41’50’’E | *GPS Coordinates: 6º34’39.7’’N 38º41’50’’E | ||
− | |||
<br/> | <br/> | ||
− | |||
= Details = | = Details = | ||
− | |||
The MHP power plant Gobecho II has a capacity of 34 kW and is planned to be inaugurated in September 2011. Current estimations show that approximately 200 households will be connected to the plant. The maximum number of households that could be supplied is estimated to be 700 (given that no public facilities such as schools and health centers are connected). | The MHP power plant Gobecho II has a capacity of 34 kW and is planned to be inaugurated in September 2011. Current estimations show that approximately 200 households will be connected to the plant. The maximum number of households that could be supplied is estimated to be 700 (given that no public facilities such as schools and health centers are connected). | ||
− | |||
+ | ► For more information click [[:file:Fact sheet Gobecho.pdf|here]]. | ||
<br/> | <br/> | ||
− | + | *'''Start of construction: '''22/09/2009 | |
− | '''Start of construction: 22/09/2009 | + | *'''Date of Commissioning:''' - |
− | + | *'''Ownership / Operation Modell: '''Gobecho Genet Electric Users Cooperative/community based cooperative society | |
− | '''Date of Commissioning:''' | + | *'''Tariff structure: '''Flat rate/monthly based per appliance |
− | + | *'''Turbine: '''Cross- flow T14 D300 HeksaHydro, Efficiency --76% | |
− | + | *'''Generator: '''Synchronous Alternator, 1450rpm, 60kVA, 3 phase, cos phi - 0.8, 50 Hz, insulation class-F, Brand Matari, origin China | |
− | |||
− | '''Tariff structure: '''Flat rate/monthly based per appliance | ||
− | |||
− | |||
− | |||
− | '''Generator: '''Synchronous Alternator, 1450rpm, 60kVA, 3 phase, cos phi - 0.8, 50 Hz, insulation class-F, Brand Matari, origin China | ||
− | |||
<br/> | <br/> | ||
− | |||
= Pictures = | = Pictures = | ||
− | {| cellspacing="1" cellpadding="1" border="0 | + | {| cellspacing="1" cellpadding="1" border="0" style="width: 100%" class="FCK__ShowTableBorders" |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | style="width: 440px" | [[File:Bild 261.jpg|thumb|left|200px|Gobecho II waterfall|alt=Bild 261.jpg]] |
− | | [[File:Gobecho II | + | | style="width: 316px" | [[File:Gobecho II powerhouse.jpg|thumb|left|200px|Gobecho II powerhouse (under construction)|alt=Gobecho II powerhouse.jpg]] |
|- | |- | ||
− | | | + | | style="width: 440px" | [[File:Gobecho II Fall (2).jpg|thumb|left|370px|Gobecho II waterfall|alt=Gobecho II Fall (2).jpg]] |
− | | Gobecho II waterfall | + | | style="width: 316px" | |
|} | |} | ||
− | |||
<br/> | <br/> | ||
− | |||
= Further Information = | = Further Information = | ||
+ | *[[Portal:Hydro|Hydro Portal on energypedia]] | ||
+ | *[[Ethiopia Energy Situation|Ethiopia Energy Situation]] | ||
+ | *[[Micro Hydro Power (MHP) - Ethiopia, Gobecho I|Micro Hydro Power (MHP) - Ethiopia, Gobecho I]] | ||
+ | *[[Micro Hydro Power (MHP) - Ethiopia, Ererte|Micro Hydro Power (MHP) - Ethiopia, Ererte]] | ||
+ | *[[Micro Hydro Power (MHP) - Ethiopia, Hagara Sodicha|Micro Hydro Power (MHP) - Ethiopia, Hagara Sodicha]] | ||
+ | <br/> | ||
= References = | = References = | ||
− | |||
<references /> | <references /> | ||
+ | [[Category:Hydro]] | ||
+ | [[Category:Micro_Hydro]] | ||
[[Category:Ethiopia]] | [[Category:Ethiopia]] | ||
− | |||
− |
Latest revision as of 18:16, 12 January 2015
Overview
Location of the Micro Hydro Power (MHP) site:
- Country: Ethiopia
- District: Bona
- River: Gange
- GPS Coordinates: 6º34’39.7’’N 38º41’50’’E
Details
The MHP power plant Gobecho II has a capacity of 34 kW and is planned to be inaugurated in September 2011. Current estimations show that approximately 200 households will be connected to the plant. The maximum number of households that could be supplied is estimated to be 700 (given that no public facilities such as schools and health centers are connected).
► For more information click here.
- Start of construction: 22/09/2009
- Date of Commissioning: -
- Ownership / Operation Modell: Gobecho Genet Electric Users Cooperative/community based cooperative society
- Tariff structure: Flat rate/monthly based per appliance
- Turbine: Cross- flow T14 D300 HeksaHydro, Efficiency --76%
- Generator: Synchronous Alternator, 1450rpm, 60kVA, 3 phase, cos phi - 0.8, 50 Hz, insulation class-F, Brand Matari, origin China
Pictures
Further Information
- Hydro Portal on energypedia
- Ethiopia Energy Situation
- Micro Hydro Power (MHP) - Ethiopia, Gobecho I
- Micro Hydro Power (MHP) - Ethiopia, Ererte
- Micro Hydro Power (MHP) - Ethiopia, Hagara Sodicha