Make sure you register to our monthly newsletter, it's going out soon! Stay up do date about the latest energy news and our current activities.
Click here to register!

Difference between revisions of "SPIS Toolbox - Contract Supplier"

From energypedia
***** (***** | *****)
***** (***** | *****)
m
Line 1: Line 1:
<div>
 
  
= Contract Supplier =
+
{{SPIS Banner}}
 +
 
 +
=== '''<span style="color:#879637;">Contract Supplier</span>''' ===
  
 
In a final step, the best system provider needs to be selected based on cost-quality considerations. In a meeting of the producer, the agricultural service provider and the shortlisted candidates, the following topics should be addressed:
 
In a final step, the best system provider needs to be selected based on cost-quality considerations. In a meeting of the producer, the agricultural service provider and the shortlisted candidates, the following topics should be addressed:
Line 13: Line 14:
 
*contract details and payment conditions.
 
*contract details and payment conditions.
  
The contract should only be concluded once allopen questions have been clarified.
+
The contract should only be concluded once all open questions have been clarified.
  
 
In the '''negotiations''' with the supplier it is important to:
 
In the '''negotiations''' with the supplier it is important to:
Line 24: Line 25:
 
*make a final summary.
 
*make a final summary.
  
== Outcome / Product ==
+
=== '''<span style="color:#879637;">Outcome/Product</span>''' ===
  
 
*Ultimate quality provider with the best cost-quality ratio;
 
*Ultimate quality provider with the best cost-quality ratio;
 
*Supply contract, including after- sale services.
 
*Supply contract, including after- sale services.
  
== Data Requirements ==
+
=== '''<span style="color:#879637;">Data Requirements</span>''' ===
  
 
*Technical and financial quotations / offers;
 
*Technical and financial quotations / offers;
Line 36: Line 37:
 
*Clarification of open questions during negotiation.
 
*Clarification of open questions during negotiation.
  
== People / Stakeholders ==
+
=== '''<span style="color:#879637;">People/Stakeholders</span>''' ===
  
 
*Producers;
 
*Producers;
Line 42: Line 43:
 
*Suppliers / system integrators.
 
*Suppliers / system integrators.
  
== Important issues ==
+
=== '''<span style="color:#879637;">Important Issues</span>''' ===
  
 
*Quotations/offers often deviate from technical specifications;
 
*Quotations/offers often deviate from technical specifications;
Line 49: Line 50:
 
*Negotiate with the supplier.
 
*Negotiate with the supplier.
  
[[Category:SPIS_Module]]
+
{{SPIS Reference}}
[[Category:Powering_Agriculture]]
 
[[Category:Tools]]
 

Revision as of 13:16, 7 June 2017

Banner header.svg

Introduction

The Toolbox on Solar Powered Irrigation Systems (SPIS) is designed to enable advisors, service providers and practitioners in the field of solar irrigation to provide broad hands-on guidance to end-users, policy-makers and financiers. Risks related to system efficiency, financial viability and the unsustainable use of water resources can thus be minimized. The Toolbox comprises informative modules supplemented with user-friendly software tools (calculations sheets, checklists, guidelines). read more

Modules and tools touch upon:

  • assessing the water requirements,
  • comparing the financial viability,
  • determining farm profitability and payback of investment in SPIS,
  • sustainably design and maintain a SPIS,
  • highlight critical workmanship quality aspects,
  • and many more.

Contract Supplier

In a final step, the best system provider needs to be selected based on cost-quality considerations. In a meeting of the producer, the agricultural service provider and the shortlisted candidates, the following topics should be addressed:

  • detailed presentation of offer and the SPIS experience by provider;
  • explanation of design procedure and tools to be used (e.g. computer-based sizing);
  • product quality and safety certificates;
  • warranty, after-sale services and spare part supply (e.g. maintenance contracts);
  • final negotiation on price, if required;
  • implementation schedule;
  • contract details and payment conditions.

The contract should only be concluded once all open questions have been clarified.

In the negotiations with the supplier it is important to:

  • define your goals;
  • identify negotiation areas;
  • look for win-win situations;
  • make realistic proposals;
  • clear up misunderstandings;
  • make a final summary.

Outcome/Product

  • Ultimate quality provider with the best cost-quality ratio;
  • Supply contract, including after- sale services.

Data Requirements

  • Technical and financial quotations / offers;
  • Shortlisted candidates;
  • Structured comparison of qualified bids;
  • Clarification of open questions during negotiation.

People/Stakeholders

  • Producers;
  • Agricultural service providers;
  • Suppliers / system integrators.

Important Issues

  • Quotations/offers often deviate from technical specifications;
  • Significant differences exist between bidders in terms of services and warranty.
  • Implementation scheduling needs to be firm and agreed upon.
  • Negotiate with the supplier.