Difference between revisions of "Mozambique Energy Situation"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
m
 
(59 intermediate revisions by 14 users not shown)
Line 1: Line 1:
 +
{{CES Country|CES Country Name=Mozambique
 +
|CES Country Capital=Maputo
 +
|CES Country Region Africa=Sub-Saharan Africa
 +
|CES Country Coordinates=25.9500° S, 32.5833° E
 +
}}
  
{| align="right" style="width: 400px; font-size: 14px;" border="0" cellspacing="1" cellpadding="5"
+
{{back button|Mozambique Off-grid Knowledge Hub|Mozambique Off-grid Knowledge Hub}}
|-
 
! style="width: 602px; text-align: center; background-color: rgb(79, 129, 189);" colspan="4" scope="col" | <font class="Apple-style-span" color="#ffffff"><span class="Apple-style-span" style="line-height: 20px;">'''Republic of Mozambique'''</span></font>
 
|-
 
| style="width: 250px; background-color: rgb(219, 229, 241);" colspan="3" | '''Capital'''
 
| style="width: 250px; background-color: rgb(219, 229, 241);" | Maputo (25° 57′ 0″ S, 32° 35′ 0″ E)
 
|-
 
| style="width: 250px; background-color: rgb(219, 229, 241);" colspan="3" | '''Official Languages(s)'''
 
| style="width: 250px; background-color: rgb(219, 229, 241);" |
 
Portuguese
 
 
 
|-
 
| style="width: 250px; background-color: rgb(219, 229, 241);" colspan="3" | '''Government'''
 
| style="width: 250px; background-color: rgb(219, 229, 241);" | Presidential Republic
 
|-
 
| style="width: 250px; background-color: rgb(219, 229, 241);" colspan="3" | '''President'''
 
| style="width: 250px; background-color: rgb(219, 229, 241);" | Armando Guebuza
 
|-
 
| style="width: 250px; background-color: rgb(219, 229, 241);" colspan="3" | '''Prime Minister'''
 
| style="width: 250px; background-color: rgb(219, 229, 241);" | Aires Ali
 
|-
 
| style="width: 250px; background-color: rgb(219, 229, 241);" colspan="3" | '''Total Area ''''''<span style="line-height: 21px;">( </span>km²<span style="line-height: 21px;">)</span>'''
 
| style="width: 250px; background-color: rgb(219, 229, 241);" | 801,590
 
|-
 
| style="width: 250px; background-color: rgb(219, 229, 241);" colspan="3" | '''Population'''
 
| style="width: 250px; background-color: rgb(219, 229, 241);" | 23,400,000 (2010 estimte)
 
|-
 
| style="width: 250px; background-color: rgb(219, 229, 241);" colspan="3" | '''Rural Population'''
 
| style="width: 250px; background-color: rgb(219, 229, 241);" | 14,400,000 (2010 estimte)
 
|-
 
| style="width: 250px; background-color: rgb(219, 229, 241);" colspan="3" | '''GDP (Nominal)'''
 
| style="width: 250px; background-color: rgb(219, 229, 241);" | US $9.580 billion (2010 estimate)
 
|-
 
| style="width: 250px; background-color: rgb(219, 229, 241);" colspan="3" | '''GDP Per Capita'''
 
| style="width: 250px; background-color: rgb(219, 229, 241);" | US $410 (2010 estimate)
 
|-
 
| style="width: 250px; background-color: rgb(219, 229, 241);" colspan="3" | '''Currency'''
 
| style="width: 250px; background-color: rgb(219, 229, 241);" | Mozambican metical (Mtn) (MZN)
 
|-
 
| style="width: 250px; background-color: rgb(219, 229, 241);" colspan="3" | '''Time Zone'''
 
| style="width: 250px; background-color: rgb(219, 229, 241);" | CAT (UTC+2)
 
|-
 
| style="width: 250px; background-color: rgb(219, 229, 241);" colspan="3" | '''Calling Code'''
 
| style="width: 250px; background-color: rgb(219, 229, 241);" | +258
 
|-
 
| style="width: 250px; background-color: rgb(219, 229, 241);" colspan="3" | '''Electricity Generation'''
 
| style="width: 250px; background-color: rgb(219, 229, 241);" | <span data-scayt_word="twh" data-scaytid="5">TWh</span>/year (year)
 
|-
 
| style="width: 250px; background-color: rgb(219, 229, 241);" colspan="3" | '''Access to Electricity'''
 
| style="width: 250px; background-color: rgb(219, 229, 241);" | <br/>
 
|-
 
| style="width: 250px; background-color: rgb(219, 229, 241);" colspan="3" | '''Wind energy (installed capacity)'''
 
| style="width: 250px; background-color: rgb(219, 229, 241);" | MW (year)
 
|-
 
| style="width: 250px; background-color: rgb(219, 229, 241);" colspan="3" | '''Solar Energy (installed capacity)'''
 
| style="width: 250px; background-color: rgb(219, 229, 241);" | MW (year)
 
|}
 
 
 
{| align="left" class="FCK__ShowTableBorders" style="width: 350px;" border="0" cellspacing="1" cellpadding="1"
 
|-
 
| __TOC__
 
  
|}
 
  
<br/>
+
=Introduction=
<div style="clear: both"></div>
 
= Overview<br/> =
 
  
Mozambique is one of the poorest countries of the world with about 54% of the population living below the national poverty line. Forest resources satisfy more than 85% of total do-mestic energy requirements and more than 95 % of energy supply in rural areas. Mozambique has considerable but little exploited energy resources, including natural gas, coal, hydro, oil, solar, biomass and wind.<br/>The energy sector is key to the country's economy already today, since energy exports make up a large share of total foreign exchange earnings. Moreover, the availability of cheap electricity is one of the main reasons for the significant foreign direct investment in energy-intensive industries in Mozambique. Energy exports (hydropower, coal, gas and possibly oil) and projects to cover the growing domestic electricity demand will play an increasingly impor-tant role in the years to come. The liberalisation of the power sector initiated in 1997 allowed for third parties from the private sector to enter the power generation, transmission and distribution markets.
+
The Republic of Mozambique is located on the south-eastern coast of Africa and has a surface area of 801,590 square kilometres. It is bordered by South Africa, Swaziland, Zimbabwe, Zambia, Malawi, Tanzania, and separated by the Indian Ocean from Madagascar. The country is divided into ten provinces, and a provincial capital city (see Map: Provinces in Mozambique). It is one of the poorest countries in the world, and the 7th poorest in Africa with a GDP per capita of USD 1281 (2019), a total GDP of USD 14.96 billion (2019), and an annual GDP growth of 3.11% (2018). <br />Mozambique has undertaken significant efforts in recent years to electrify the country. The electrification rate has increased from 5% in 2001 to 29% in 2019<ref>World Bank, ‘Mozambique | Data’. <nowiki>https://data.worldbank.org/indicator/EG.ELC.ACCS.UR.ZS?locations=MZ</nowiki></ref>. In 2022, it increased to 44%<ref>S.Excia Eng. Carlos Zacarias - Ministro dos Recursos Minerais e Energia (MIREME). 2022. CDD Just Energy Transition.  
  
Access to electricity is among the lowest in the world, especially in rural areas where only 1% of the population is supplied. The national grid only reaches a small part of the country. Many district capitals depend on expensive and often unreliable power generation with diesel generators. Outside these towns, the situation is even worse. The overwhelming majority of rural households, most rural schools, health centres and administrative posts are without access to electricity. Lack of mechanical power is a bottleneck for the rural subsistance agricultural production, as grain producers have to walk long distances to the nearest milling facility. Rural areas lack electricity for lighting, radio and communication in households and for refrigeration in small commerce. Nevertheless, many rural household spend a considerable share of their income for modern energy in the form of kerosene or batteries (€ 4–5 per month). Lack of access to electricity restricts the local population’s opportunities for income-generating activities.<br/>
+
https://www.youtube.com/watch?v=3GphYhRJq50</ref> from 34% in 2020.<ref>Renewables in Mozambique (2021):https://www.lerenovaveis.org/contents/lerpublication/aler_mar2021_resumo-renovaveis-em-mocambique-2021.pdf</ref> Access to electricity, however, remains low and is mainly focused on urban areas. In 2019, 72% of the urban population had access to electricity compared to 5% of the rural population. <ref>World Bank, ‘Mozambique | Data’. <nowiki>https://data.worldbank.org/indicator/EG.ELC.ACCS.UR.ZS?locations=MZ</nowiki></ref>This imbalance represents an important challenge to achieving country-wide electrification by 2030, considering that the vast majority (63% in 2019) of Mozambique’s population lives in rural areas.<ref name=":0">Mozambique: Energy and the Poor’, K. Naidoo, C. Loots, 2020, <nowiki>https://sun-connect-news.org/fileadmin/DATEIEN/Dateien/New/2021-01-29_UNDP-UNCDF-Mozambique-Energy-and-the-Poor.pdf</nowiki>.</ref>  
  
<br/>
+
The national grid including off grid facilities is claimed to reach some 30&nbsp;% of the country today in terms of numbers of people with potential access to the grid (not connected). Many district capitals depend on expensive and often unreliable power generation with diesel generators. Outside these towns, the situation is even worse. The overwhelming majority of rural households, most rural schools, health centres and administrative posts are without access to electricity. Lack of mechanical power is a bottleneck for the rural subsistence agricultural production, as grain producers have to walk long distances to the nearest milling facility. Rural areas lack electricity for lighting, radio and communication in households and for refrigeration in small commerce. Nevertheless, many rural household spend a considerable share of their income for modern energy in the form of kerosene or batteries (€ 4–5 per month). Lack of access to electricity restricts the local population’s opportunities for income-generating activities.<br />The energy sector is key to the country's economy already today, since energy exports make up a large share of total foreign exchange earnings. Moreover, the availability of cheap electricity is one of the main reasons for the significant foreign direct investment in energy-intensive industries in Mozambique. Energy exports (hydropower, coal, gas and possibly oil) and projects to cover the growing domestic electricity demand will play an increasingly important role in the years to come. The liberalisation of the power sector initiated in 1997 allowed for third parties from the private sector to enter the power generation, transmission and distribution markets without impressive results so far (2012).<br /><span style="mso-ansi-language:DE" lang="DE"></span>[[Mozambique Energy Situation#toc|►Go to Top]]
  
== Potentials ==
+
==Potentials ==
 +
Mozambique has considerable energy resources with an estimated hydropower potential of 12,000 MW and also gas reserves (estimated at reaching 700 billion cubic metres) and vast coal reserves (estimated to reach 140 million TJ) with the potential of generating approx. 500 MW and 5,000 MW respectively. Regarding solar, it has about 23 TW capacity, out of which 2.7 GW could easily be harnessed<ref name="BERF (2016). Business environment constraints in Mozambique’s Renewable Energy Sector: Solar PV Systems and Improved Cook Stoves, Business Environment Reform Facility, UK Department of International Development. https://assets.publishing.service.gov.uk/media/5c76b459ed915d3547d50a07/Final_BERF-Mozambique-Renewable-Energy-8th-Dec2016.pdf">BERF (2016). Business environment constraints in Mozambique’s Renewable Energy Sector: Solar PV Systems and Improved Cook Stoves, Business Environment Reform Facility, UK Department of International Development. https://assets.publishing.service.gov.uk/media/5c76b459ed915d3547d50a07/Final_BERF-Mozambique-Renewable-Energy-8th-Dec2016.pdf</ref>.
  
Mozambique has considerable energy resources with an estimated hydropower potential of 12,000 MW and also gas reserves (estimated at reaching 700 billion cubic metres) and vast coal reserves (estimated to reach 140 million TJ) with the potential of generating approx. 500 MW and 5,000 MW respectively.
+
A National Policy and Strategy for Biofuels was approved in February 2009 which focuses on ethanol from sugarcane and sorghum and coconut and jatropha for biodiesel. This policy has led to hundreds of millions of dollars in investment plans in ethanol and biodiesel in Mozambique. In October 2007 ethanol plant in Mozambique received US$510 million in support from the UK. However, the actual on-the-ground activity is unclear and production has yet to commence. Biofuels are not readily available in the country and export details are also not available<ref name="The biofuels sector, and especially the biodiesel sector, has attracted considerable investment. Hundreds of millions of dollars of investment has been made. Much of this has been in the sugar sector which is growing rapidly. At least 7 biodiesel/jatropha plantations have been set up with poor -- and controversial – results. (see Justica Ambiental!/Uniao Nacional de Camponeses, Jatropha: A Socio-economic pitfall for Mozambique. August 2009. http://ictsd.org/i/news/biores/45169/">The biofuels sector, and especially the biodiesel sector, has attracted considerable investment. Hundreds of millions of dollars of investment has been made. Much of this has been in the sugar sector which is growing rapidly. At least 7 biodiesel/jatropha plantations have been set up with poor -- and controversial – results. (see Justica Ambiental!/Uniao Nacional de Camponeses, Jatropha: A Socio-economic pitfall for Mozambique. August 2009. http://ictsd.org/i/news/biores/45169/</ref>.
  
<br/>
+
'''[[Mozambique Renewable Energy Potential|Click here to read more about the RE potential in Mozambique]]'''.
  
== Renewable Energy Potential<br/> ==
+
[[Mozambique Energy Situation#toc|►Go to Top]]
 +
==Renewable Energy Potential==
  
{| cellspacing="1" cellpadding="1" border="1" style="width: 100%"
+
{| style="width: 100%" cellspacing="1" cellpadding="1" border="1"
 
|-
 
|-
! scope="col" | Resource
+
! scope="col" |Resource
! scope="col" | Availability
+
! scope="col" |Availability
 +
! scope="col" |Total Potential
 
|-
 
|-
| Wind
+
|Wind
| Along the cost Niassa (Average wind speed 6 m/s)<br/>
+
|Along the coasts (Speeds between 4 - 6 m/s at 80m height)<br />
 +
| 4.5 GW<ref>Recurso Eólico’, accessed 24 June 2021, <nowiki>https://www.funae.co.mz/index.php/pt/recursos/recurso-eolico</nowiki></ref>
 
|-
 
|-
| Solar
+
|Solar
| 4.5-7 kWh/m2/day
+
|4.5-7 kWh/m2/day
 +
|2.7 GW<ref>Pranab Baruah and Brendan Coleman, ‘Country Brief: Mozambique Off-Grid Solar Power in Mozambique: Opportunities for Universal Energy Access and Barriers to Private Sector Participation’, n.d., 26.</ref>
 
|-
 
|-
| Hydro
+
|Hydro
| 12 GW (1 GW in small installations up to 10 MW)
+
|12 GW (1 GW in small installations up to 10 MW)
 +
| 12 000 MW
 
|-
 
|-
| Biomass
+
|Biomass
| 100's of MW (Big bagasse potential)
+
|100's of MW (Big biogas potential)
 +
|2 GW biomass potential<ref>GET.invest, ‘Renewable Energy Potential – GET.Invest’, accessed 21 April 2021, <nowiki>https://www.get-invest.eu/market-information/mozambique/renewable-energy-potential/</nowiki></ref>
 
|}
 
|}
  
<br/>
+
[[Mozambique Renewable Energy Potential|'''Click here to read more about the RE potential in Mozambique.''']]
  
== Demand and Supply<br/> ==
+
[[Mozambique Energy Situation#toc|►Go to Top]]
 +
==Electricity Generation and Consumption==
  
Peak electricity demand was 530 MW in 2010 (without Mozal) with an energy consumption of approximately 3,032 GWh. The increase in power consumption has been significant during recent years with average annual increases in the order of 6 to 8 % over the last 10 years. These figures reflect supply to domestic, commercial and industrial consumers in the national power network supplied by Electricidade de Moçambique (EdM) the national power company. Approx. 136 MW (61 MW from hydro and 75 MW from diesel and gas) are supplied by EdM's own generation, mainly by ageing plants requiring refurbishment. The remaining demand is supplied through a purchase agreement with Cahora Bassa, a hydropower plant at the Zambezi River with an installed capacity of 2,075 MW. The number of consumers has grown with more than 10% annually since the year 2000 and was about 850,000 in 2010 (2,240 Medium & High Voltage clients). At present still only 16% of the population has access to electricity. Power demand forecasts indicate that with an average projected growth rate of 6% p.a. Mozambique will reach a maximum demand of 1,350 MW by 2030 and a projected consumption of 8,300 GWh. From 2009 until 2013, it is foreseen that demand reach 560 MW by 2013. For meeting the country‘s electricity needs in a timely manner, it is imperative given that the Cahora Bassa‘s reserve for domestic market requirements of 400 MW is almost exhausted. Therefore it is important that the HEP sites Mavuzi, Chicamba, Corumana are rehabilitated and that the technical and economical feasb. HEP sites Tsate, Mueneze, Alto Malema, Massingir and Mavuzi II and III are errected and the retrofit of the MTC Maputo Gas Turbine. These investments would sum to approx. 415 MW ICap and approx. 300 MW additional firm power. Several large scale IPPs, mainly for export purposes, are planned (totalling ca. 3 to 5 GW).
+
Mozambique has a total installed capacity of 2,780 MW (2020). The projections for 2030 from the Power Sector Master Plan show an expected increase in the total installed capacity to 6,001 MW. Hydropower is the dominating electricity source with 2,189 MW, 79% of the total energy mix, followed by 442 MW from gas (16%), 108 MW from heavy fuel oil (HFO) (4%) and 41 MW from solar (1%) (2020).<ref>Aler_mar2021_resumo-Renovaveis-Em-Mocambique-2021.Pdf’, accessed 23 April 2021, <nowiki>https://www.lerenovaveis.org/contents/lerpublication/aler_mar2021_resumo-renovaveis-em-mocambique-2021.pdf</nowiki></ref>
  
Biomass coming from an estimated 30.6 million hectares of forest lands for wood fuel and charcoal represents about 80% of the total energy consumed by the households. This value is even bigger in remote rural areas. Every year it is estimated that 16,000,000 m3 of forestry resources are burnt to meet rural energy requirements.
+
There are six working hydropower stations across the country. The largest hydroelectric plant is located in the Tete province and is operated by Hidroeléctrica de Cahora Bassa (HCB).<ref>Mozambique: Energy and the Poor’, K. Naidoo, C. Loots, 2020, <nowiki>https://sun-connect-news.org/fileadmin/DATEIEN/Dateien/New/2021-01-29_UNDP-UNCDF-Mozambique-Energy-and-the-Poor.pdf</nowiki>.</ref> HCB is responsible for most of the hydroelectric generation, with a capacity of 2,075 MW. In 2014, it supplied up to 88% of the power consumed in Mozambique.<ref>EDM, Integrated Master Plan 2018-2043,<nowiki>https://www.edm.co.mz/en/document/reports/integrated-master-plan-2018-2043</nowiki></ref> Due to the low electricity demand (peak demand in 2014 was estimated at only 831 MW) resulting from scarce energy access in Mozambique, the majority of the generation from HCB is exported to South Africa. Smaller shares are exported to Zimbabwe and Botswana. <ref name=":0" />
  
The present consumption of oil products is in the order of 600 million litres per year, transport being the lead user followed by agriculture. The turbulence in international oil markets since 2004 resulting in abrupt fluctuations of oil prices have become a source of social unrest. The reduction of the Mozambican energy bill, especially for imports of liquid fossil fuels, which in 2006 amounted to 14% of national imports, deserves special attention. Today both liquid pe-troleum gas (LPG) and kerosene have only a small impact in terms of the national energy ba-lance. LPG is mainly used in the urban centres of Maputo, Matola, Beira and Nampula. How-ever due to bottlenecks in supplies the national consumption does not exceed 14,000 tons.
+
The table below shows the most recent energy indicators reported by the IEA. In 2018, the total primary energy supply was 10.43 Mtoe, from a total of 20.23 Mtoe produced that year. Final electricity consumption was only 13.63 TWh, however, this number has increased drastically by more than 2000% since 1990.<ref>IEA, ‘Mozambique - Countries & Regions’ <nowiki>https://www.iea.org/countries/mozambique</nowiki></ref>
 +
{| class="wikitable"
 +
|+'''Table: Mozambique’s key energy indicators'''
 +
|Energy  production
 +
|20.23  Mtoe
 +
|-
 +
|Total  primary energy supply
 +
|10.43  Mtoe
 +
|-
 +
|Total  electricity consumption
 +
|13.63  TWh
 +
|-
 +
|Electricity  consumption per capita
 +
|0.5  MWh
 +
|}
 +
'''[[Mozambique Electricity Situation|For more information about generation and consumption of electricity in Mozambique, please click here.]]'''
  
Mozambique´s considerable energy resources enable the country to meet its internal demand and still export energy to Southern and East African countries. The availability of energy resources including hydro, natural gas and coal, plus the geographical positioning of the country – acting both as route to the countries inland well served by harbours, railway and pipeline systems, and as an interface between the Southern African Development Community (SADC) and the Eastern African Community (EAC) gives Mozambique a privileged, strategic position and role in the regional energy sector.
+
[[Mozambique Energy Situation#toc|►Go to Top]]
  
<br/>However despite the countries significant electric power potential there should be no rapid shift expected from biomass to electricity use because Mozambique is a vast country with the majority of the population living in rural communities dispersed throughout the provinces. Energy solutions must take into consideration this reality and adapt to it by combining an intensification of electrification in those areas served by the national electricity grid and the adoption of modern technological solutions and energy services in particular for remote areas, using sustainable biomass, solar and hydropower resources.
+
<br />
  
<br/>
+
==Noteworthy Trends==
  
== Noteworthy Trends<br/> ==
+
<span lang="en-us"><span>Despite its </span>large renewable energy resources, the country energy sector focus is on large hydro projects in the Zambezi Basin (i.e. Mphanda Nkuwa) to produce power for export to South Africa and for industry. Mozambique relies heavily on the export of commercial electricity to South Africa from the Cahora Bassa dam on the Zambezi River to generate foreign exchange income.</span>
 
 
<span lang="EN-US"><span>Despite its </span>large renewable energy resources, the country energy sector focus is on large hydro projects in the Zambezi Basin (i.e. Mphanda Nkuwa) to produce power for export to South Africa and for industry. Mozambique relies heavily on the export of commercial electricity to South Africa from the Cahora Bassa dam on the Zambezi River to generate foreign exchange income.</span>
 
  
 
The two immediate projects are the 850 MW (nominal) expansion of the Cahora Bassa dam and the controversial Mphanda Nkuwa dam (2500 MW). See table below.
 
The two immediate projects are the 850 MW (nominal) expansion of the Cahora Bassa dam and the controversial Mphanda Nkuwa dam (2500 MW). See table below.
  
<br/>
+
{| style="width: 100%" cellspacing="0" cellpadding="0" border="1"
 
 
{| cellspacing="0" cellpadding="0" border="1" style="width: 100%"
 
 
|-
 
|-
| style="vertical-align: top; width: 213px" |  
+
| style="width: 213px; vertical-align: top" |
 
'''Project Name Type of Project'''
 
'''Project Name Type of Project'''
  
| style="vertical-align: top; width: 213px" |  
+
| style="width: 213px; vertical-align: top" |
 
'''Size'''
 
'''Size'''
  
| style="vertical-align: top; width: 213px" |  
+
| style="width: 213px; vertical-align: top" |
 
'''Comments'''
 
'''Comments'''
  
 
|-
 
|-
| style="vertical-align: top; width: 213px" |  
+
| style="width: 213px; vertical-align: top" |
 
CB North Bank Hydropower expansion
 
CB North Bank Hydropower expansion
  
| style="vertical-align: top; width: 213px" |  
+
| style="width: 213px; vertical-align: top" |
 
850 to 1300 additional MW
 
850 to 1300 additional MW
  
| style="vertical-align: top; width: 213px" |  
+
| style="width: 213px; vertical-align: top" |
 
Detailed feasibility study is underway
 
Detailed feasibility study is underway
  
 
|-
 
|-
| style="vertical-align: top; width: 213px" |  
+
| style="width: 213px; vertical-align: top" |
 
Mphanda Nkuwa Hydropower
 
Mphanda Nkuwa Hydropower
  
| style="vertical-align: top; width: 213px" |  
+
| style="width: 213px; vertical-align: top" |
 
2500 MW
 
2500 MW
  
| style="vertical-align: top; width: 213px" |  
+
| style="width: 213px; vertical-align: top" |
 
Env. + Soc. Impact Study underway
 
Env. + Soc. Impact Study underway
  
 
|-
 
|-
| style="vertical-align: top; width: 213px" |  
+
| style="width: 213px; vertical-align: top" |
 
Massingir Hydropower
 
Massingir Hydropower
  
| style="vertical-align: top; width: 213px" |  
+
| style="width: 213px; vertical-align: top" |
 
40 MW
 
40 MW
  
| style="vertical-align: top; width: 213px" |  
+
| style="width: 213px; vertical-align: top" |
 
EDM managed
 
EDM managed
  
 
|-
 
|-
| style="vertical-align: top; width: 213px" |  
+
| style="width: 213px; vertical-align: top" |
 
Lurio Hydropower
 
Lurio Hydropower
  
| style="vertical-align: top; width: 213px" |  
+
| style="width: 213px; vertical-align: top" |  
 
120 MW
 
120 MW
  
| style="vertical-align: top; width: 213px" |  
+
| style="width: 213px; vertical-align: top" |
<br/>
+
<br />
  
 
|-
 
|-
| style="vertical-align: top; width: 213px" |  
+
| style="width: 213px; vertical-align: top" |
 
Majawa Hydropower
 
Majawa Hydropower
  
| style="vertical-align: top; width: 213px" |  
+
| style="width: 213px; vertical-align: top" |
 
25 MW
 
25 MW
  
| style="vertical-align: top; width: 213px" |  
+
| style="width: 213px; vertical-align: top" |
<br/>
+
<br />
  
 
|-
 
|-
| style="vertical-align: top; width: 213px" |  
+
| style="width: 213px; vertical-align: top" |
 
Malema Hydropower
 
Malema Hydropower
  
| style="vertical-align: top; width: 213px" |  
+
| style="width: 213px; vertical-align: top" |
 
60 MW
 
60 MW
  
| style="vertical-align: top; width: 213px" |  
+
| style="width: 213px; vertical-align: top" |
<br/>
+
<br />
  
 
|-
 
|-
| style="vertical-align: top; width: 213px" |  
+
| style="width: 213px; vertical-align: top" |
 
Moatize Coal fired power plant
 
Moatize Coal fired power plant
  
| style="vertical-align: top; width: 213px" |  
+
| style="width: 213px; vertical-align: top" |
 
1500 MW
 
1500 MW
  
| style="vertical-align: top; width: 213px" |  
+
| style="width: 213px; vertical-align: top" |
 
IES is the developer
 
IES is the developer
  
 
|-
 
|-
| style="vertical-align: top; width: 213px" |  
+
| style="width: 213px; vertical-align: top" |
 
Temane Combined Cycle natural gas fired power plant
 
Temane Combined Cycle natural gas fired power plant
  
| style="vertical-align: top; width: 213px" |  
+
| style="width: 213px; vertical-align: top" |
 
300-400 MW
 
300-400 MW
  
| style="vertical-align: top; width: 213px" |  
+
| style="width: 213px; vertical-align: top" |
On the SASOL gaspipeline. 2010
+
On May 2022, USAID and DFC  signed an agreement with EDM to provide a loan of USD 200 m to support the design, construction and operation of the project. <ref>US backs Mozambique’s energy security projects: https://www.esi-africa.com/us-backs-mozambiques-energy-security-projects/</ref>
  
 
|}
 
|}
  
<br/>
 
  
<br/>
+
As a result of March 2009 Government policy, the biofuels sector is receiving hundreds of millions of dollars in investment (sugar – ethanol, jatropha --- biodiesel). However, production has yet to commence and there is considerable controversy about transparency and food vs. energy.
 +
 
 +
[[Mozambique Energy Situation#toc|►Go to Top]]
 +
 
 +
==Market Situation==
 +
 
 +
The market situation for '''photovoltaic (PV)''' and hydro power technologies and services is still in early stages.The off-grid market is identified to be around 4 million households, creating an opportunity for not only electrification but also boosting the local economy. UNEP has estimated that for every 10,000 off-grid houses connection, 30 jobs are created by renewable energy. The jobs could be created in the local manufacturing, distribution and maintenance. Apart from electrification, off-grid can also support other productive uses of electricity especially in the agriculture sector (solar pumping)<ref name="Global Green Growth Institute (2017). Country Brief: Mozambique. Off-grid solar power in Mozambique: Opportunities for universal energy access and barriers to private sector participation. https://sun-connect-news.org/fileadmin/DATEIEN/Dateien/New/Country-Brief-Mozambique.pdf">Global Green Growth Institute (2017). Country Brief: Mozambique. Off-grid solar power in Mozambique: Opportunities for universal energy access and barriers to private sector participation.fckLRfckLRhttps://sun-connect-news.org/fileadmin/DATEIEN/Dateien/New/Country-Brief-Mozambique.pdf</ref>.
 +
 
 +
The private sector is underdeveloped in Mozambique and until 2018, only 25 business were either active or were inclined to enter the market in near future. These businesses are mostly dependent on public tender and donor initiatives. However, the informal off-grid solar products market is thriving in Mozambique with products imported from South Africa, Tanzania or China. This could be because Mozambique has a higher import duty and VAT on PV and ICS as compared to other sub-Saharan countries such as Ethiopia, Ghana or Tanzania. These products in the informal market enter via informal channels and do not pay the import taxes<ref name="Lighting Global (2018):Off-Grid Solar Market Assessment in Mozambique https://www.lightingafrica.org/wp-content/uploads/2019/07/Mozambique_off-grid-assessment.pdf">Lighting Global (2018):Off-Grid Solar Market Assessment in MozambiquefckLRfckLR https://www.lightingafrica.org/wp-content/uploads/2019/07/Mozambique_off-grid-assessment.pdf</ref>.
 +
 
 +
The Improved Cookstove (ICS) market in Mozambique is small and is categorized by mostly donor/NGOs initiatives. Up until March 2020, there were 10-15 companies supplying ICS stoves (charcoal and fuelwood) in the Mozambique market compared to 4 ICS suppliers in 2018. Some of the companies include: MozCarbon, ENI,  ICEMA LDA, Sogepal and Pamoja Moçambique. For the ICS supply chain, two-step distribution chain i.e. producers to consumers is most common but many companies are also expanding the distribution chain to reach consumers outside the capital city, Maputo.<ref>EnDev, ‘Workshop Energy Market Scorecard Mozambique ICS 2020’</ref>
  
As a result of March 2009 Government policy, the biofuels sector is receiving hundreds of millions of dollars in investment (sugar – ethanol, jatropha --- biodiesel).<span></span>However, production has yet to commence and there is considerable controversy about transparency and food vs. energy.<br/>
+
For green mini grid, the tendering process is similar as big energy projects and this increases the complexity for obtaining a concession contact, especially for local businesses. However, the government is promoting mini-grids for public spaces such as health centres, schools and water pumping for community and agricultural purposes<ref name="BERF (2016). Business environment constraints in Mozambique’s Renewable Energy Sector: Solar PV Systems and Improved Cook Stoves, Business Environment Reform Facility, UK Department of International Development. https://assets.publishing.service.gov.uk/media/5c76b459ed915d3547d50a07/Final_BERF-Mozambique-Renewable-Energy-8th-Dec2016.pdf">BERF (2016). Business environment constraints in Mozambique’s Renewable Energy Sector: Solar PV Systems and Improved Cook Stoves, Business Environment Reform Facility, UK Department of International Development. https://assets.publishing.service.gov.uk/media/5c76b459ed915d3547d50a07/Final_BERF-Mozambique-Renewable-Energy-8th-Dec2016.pdf</ref>. There is also a new regulation which has provisions for green mini-grids but it is still unclear how they will be implemented on the ground. <ref>https://amer.org.mz/wp-content/uploads/2021/12/Decreto-nA%CC%82o-93-2021-de-10-de-Dezembro-de-2021-Aprova-o-Regulamento-de-Acesso-A%CC%83-Energia-nas-Zonas-Fora-da-Rede.pdf</ref>
  
<br/>
+
In the case of micro and pico hydro there are no readily available products available in the country which makes prices prohibitive for communities and individual households. However there is a good potential for local manufacture of water wheels and pico turbines, although the market is still very limited and therefore local services tend to be rather expensive.<br />
  
== Market Situation<br/> ==
+
In its first phase, ENDEV MOZAMBIQUE started pioneer activities in the local manufacture of water wheels for upgrading traditional maize mills and the manufacture of pico turbines with most promising results. Therefore it is envisaged to upscale micro/pico hydro power activities sustainably on a local level with an appropriate and cost effective approach for technical capacity building, technology transfer and market development.
  
The market situation for '''photovoltaic (PV)''' and hydro power technologies and services is still in a very incipient stage. In the case of micro and pico hydro there are no readily available products available in the country which makes prices prohibitive for communities and individual households. However there is a good potential for local manufacture of water wheels and pico turbines, although the market is still very limited and therefore local services tend to be rather expensive.<br/>
+
The market for PV is divided into steadily growing local market spots and mainly capital based PV providers working with directly imported equipment for government projects funded by donors. The local market is efficient and reliable but informal, with low quality products of Chinese origin coming mainly from RSA. Market actors are lacking technical knowledge. In parallel to the dissemination of products from the local market ENDEV MOZAMBIQUE has started designing an energy efficient compact '''small solar home system (SSHS)''' with a local enterprise. In the case of PV for household lighting, technical capacity building, technology transfer and market development is envisaged within a Public Private Partnership (PPP) measure with German enterprises and higher quality products.
  
In its first phase, ENDEV MOZAMBIQUE has started pioneer activities in the local manufacture of water wheels for upgrading traditional maize mills and the manufacture of pico turbines with most promising results. Therefore it is envisaged to upscale micro/pico hydro power activities sustainably on a local level with an appropriate and cost effective approach for technical capacity building, technology transfer and market development. The market for PV is divided into steadily growing local market spots and mainly capital based PV providers working with directly imported equipment for government projects funded by donors. The local market is efficient and reliable but informal, with low quality products of Chinese origin coming mainly from RSA. Market actors are lacking technical knowledge. In parallel to the dissemination of products from the local market ENDEV MOZAMBIQUE has started designing an energy efficient compact '''small solar home system (SSHS)''' with a local enterprise. In the case of PV for household lighting, technical capacity building, technology transfer and market development is envisaged within a Public Private Partnership (PPP) measure with German enterprises and higher quality products.<br/>
+
* [[Mozambique Solar Hub|'''Click here to read about the market situation for solar solutions in Mozambique.''']]
 +
* [[Mozambique Cooking Energy Hub|'''Click here to read about the market situation for improved cookstoves in Mozambique.''']]
 +
* [[Mozambique Productive Uses of Energy Hub|'''Click here to read about the market situation for solar irrigation in Mozambique.''']]<br />
 +
 
 +
<u>In addition to the overarching need for developing the countries extensive energy resources (hydro, coal, gas and biomass) for both domestic and regional consumption the main challenges in the power sector in Mozambique are:</u><br />
  
<u>In addition to the overarching need for developing the countries extensive energy resources (hydro, coal, gas and biomass) for both domestic and regional consumption the main challenges in the power sector in Mozambique are:</u><br/>
 
 
*Ensuring that affordable electricity supply is available to meet the rapidly growing domestic demand. In the near term, this will involve the continued extension of the grid with a focus on loss reduction and intensification of the grid,
 
*Ensuring that affordable electricity supply is available to meet the rapidly growing domestic demand. In the near term, this will involve the continued extension of the grid with a focus on loss reduction and intensification of the grid,
*Reaching the vast areas of the country beyond the national grid managed by EdM. The GoM is committed to supporting decentralized electrification of social infrastructure (rural schools, clinics and administrative offices) and to increase access to modern energy services to villages and rural enterprises through PV systems, micro/pico-hydro schemes, modern biomass energy, and other Renewable Energy Technologies (RETs),
+
*Reaching the vast areas of the country beyond the national grid managed by EDM. The GoM is committed to supporting decentralized electrification of social infrastructure (rural schools, clinics and administrative offices) and to increase access to modern energy services to villages and rural enterprises through PV systems, micro/pico-hydro schemes, modern biomass energy, and other Renewable Energy Technologies (RETs),
 
*Ensuring that power shortages do not become a constraint on economic growth. Several GoM proposed generation and transmission ―mega-projects‖ will address sufficiency and security of supply for the medium to long-term,
 
*Ensuring that power shortages do not become a constraint on economic growth. Several GoM proposed generation and transmission ―mega-projects‖ will address sufficiency and security of supply for the medium to long-term,
*Institutional strengthening and capacity development of the main sector public institutions (MoE, EdM, FUNAE and CNELEC) but also of the private sector composed of NGOs, MFIs, and local enterprises working with RETs, in order to improve their respective performance, governance and effectiveness.<br/>
+
* Institutional strengthening and capacity development of the main sector public institutions (MoE, EdM, FUNAE and CNELEC) but also of the private sector composed of NGOs, MFIs, and local enterprises working with RETs, in order to improve their respective performance, governance and effectiveness.<br /><span lang="en-us"><span></span></span>
 +
[[Mozambique Energy Situation#toc|►Go to Top]]
 +
 
 +
=Key Problems of the Energy Sector=
 +
 
 +
Power Africa states that Mozambique's energy sector's most challenging issues are as follows<ref name="Power Africa. (2018). Mozambique Factsheet. Retrieved from: https://www.usaid.gov/sites/default/files/documents/1860/Mozambique_-_November_2018_Country_Fact_Sheet.pdf">Power Africa. (2018). Mozambique Factsheet. Retrieved from: https://www.usaid.gov/sites/default/files/documents/1860/Mozambique_-_November_2018_Country_Fact_Sheet.pdf</ref>:
  
<br/>
+
*Public Finances/Macro-economic issues<br />
 +
*Lacking credible&nbsp;utility and cost-reflective tariff<br />
 +
*Lack of strong, transparent regulator<br />
  
<u>Cumulative capacity, by technology:</u><br/>
+
=Policy Framework, Laws and Regulations=
#<span lang="EN-US">Wind: NONE</span><br/>
 
#<span lang="EN-US">Solar PV: NO GRID CONNECT. SMALL OFF GRID MARKET.</span>
 
#<span lang="EN-US">CSP: NONE</span>
 
#<span lang="EN-US">Solar thermal:<span></span>Very small household and tourism market</span>
 
#<span lang="EN-US">Geothermal: NONE.</span>
 
#<span lang="EN-US">Bioenergy (heat and/or power):<span></span>5-10 MW in 5 sugar refineries (Self consumed)</span>
 
#<span lang="EN-US">Hydropower: 2,075 MW Cahora Bassa dam dominates the energy sector.<span></span>This is owned by Hidroelectrica de Cahora Bassa (HCB), whose assets are 85% owned by the Mozambique government.<br/>160 MW, mostly of hydropower, is managed by Electricidade de Mozambique (EDM)</span>
 
#<span lang="EN-US">Biofuels production data – for both ethanol and biodiesel.<span></span><br/>A [[Www.biofuelsdigest.com/blog2/2009/03/27/mozambique-establishes-national-biofuels-policy|National Policy and Strategy for Biofuels]] was approved in February 2009 which focuses on ethanol from sugarcane and sorghum and coconut and jatropha for biodeisel. &lt; www.biofuelsdigest.com/blog2/2009/03/27/mozambique-establishes-national-biofuels-policy&gt; .<span></span><br/>This policy has led to hundreds of millions of dollars in investment plans in ethanol and biodiesel in Mozambique. An October 2007 ethanol plant in Mozambique received US$510 million in support from the UK. However, the actual on-the-ground activity is unclear and production has yet to commence.<span></span>Biofuels are not readily available in the country and export details are also not available. </span><ref name="The biofuels sector, and especially the biodiesel sector, has attracted considerable investment. Hundreds of millions of dollars of investment has been made. Much of this has been in the sugar sector which is growing rapidly. At least 7 biodiesel/jatropha plantations have been set up with poor -- and controversial – results. (see Justica Ambiental!/Uniao Nacional de Camponeses, Jatropha: A Socio-economic pitfall for Mozambique. August 2009. http://ictsd.org/i/news/biores/45169/">The biofuels sector, and especially the biodiesel sector, has attracted considerable investment. Hundreds of millions of dollars of investment has been made. Much of this has been in the sugar sector which is growing rapidly. At least 7 biodiesel/jatropha plantations have been set up with poor -- and controversial – results. (see Justica Ambiental!/Uniao Nacional de Camponeses, Jatropha: A Socio-economic pitfall for Mozambique. August 2009. http://ictsd.org/i/news/biores/45169/</ref><br/>
 
#<span lang="EN-US">Marine energy (specify technology) NONE</span>
 
<div><br/></div>
 
= Policy Framework, Laws and Regulations =
 
  
Within PARPA (PRSP), the programme for reduction and alleviation of absolute poverty, the GoM has been granting high priority to efforts to increase access to electricity for the population. Within the PARPA II the GoM has affirmed the critical role of the energy sector in reducing poverty. Adequate and equitable access to energy resources and services such as the provision of energy services to households, rural schools, administrative offices, and hospitals in rural areas is defined as a key driver of growth and poverty alleviation. The energy-related goals set in the PARPA are being operationalised by GoM through a number of strategies, investments and studies that have been prepared or are under way. The PARPA II (§507ff) outlines a programme for the energy sector, which entails: Electrification, Liquid Fuels, Renewable Energy, and Intersectoral Collaboration.
+
The legal framework relating to energy in Mozambique is composed of a variety of policies, strategies and regulations, the most important ones being the energy strategy (2009), the policy for the development of new and renewable energies 2011-2025 (2011), the strategy of the conversation and sustainable use of biomass energy (2013), the strategy of biofuels (2009), the regulation of biofuels and their mixture and the regulation that established the feed in tariff for new and renewable energies - REFIT (2014).
 +
 
 +
Within PARPA (PRSP), the programme for reduction and alleviation of absolute poverty, the GoM has been granting high priority to efforts to increase access to electricity for the population. Within the PARPA II the GoM has affirmed the critical role of the energy sector in reducing poverty. Adequate and equitable access to energy resources and services such as the provision of energy services to households, rural schools, administrative offices, and hospitals in rural areas is defined as a key driver of growth and poverty alleviation. The energy-related goals set in the PARPA are being operationalised by GoM through a number of strategies, investments and studies that have been prepared or are under way. The PARPA II (§507ff) outlines a programme for the energy sector, which entails: Electrification, Liquid Fuels, Renewable Energy, and Intersectoral Collaboration.<br />
  
 
<u>The Energy Policy approved March 3rd 1998 by the Council of Ministers under Resolution 5/98 established with the following objectives among others relevant for ENDEV MOZAMBIQUE.:</u>
 
<u>The Energy Policy approved March 3rd 1998 by the Council of Ministers under Resolution 5/98 established with the following objectives among others relevant for ENDEV MOZAMBIQUE.:</u>
 +
 
*Guarantee reliable supply of energy, at lowest possible cost, in order to meet present demand and future levels based on economic development trajectories,
 
*Guarantee reliable supply of energy, at lowest possible cost, in order to meet present demand and future levels based on economic development trajectories,
 
*Increase the energy options available for household consumption,
 
*Increase the energy options available for household consumption,
Line 261: Line 233:
 
*Promote competitive, dynamic and more efficient entrepreneurs.
 
*Promote competitive, dynamic and more efficient entrepreneurs.
  
<br/>
+
<u>In March 2009 the Policy for Renewables was defined with the following objectives among others with relevance for ENDEV MOZAMBIQUE:</u>
  
<u>In March 2009 the Policy for Renewables was defined with the following objectives among others with relevance for ENDEV MOZAMBIQUE:</u>
 
 
*Increase the access to modern energy services of high quality and accessible prices,
 
*Increase the access to modern energy services of high quality and accessible prices,
 
*Reduce poverty and contribute to the Millennium Development Goals,
 
*Reduce poverty and contribute to the Millennium Development Goals,
*Contribute to the generation of local and national income and employment.
+
* Contribute to the generation of local and national income and employment.
  
<br/>
+
The revised Energy Strategy aims to align Mozambique with best international practices for efficient energy utilization, raising awareness amongst its citizens about good environmental practices, diversifying the energy supply matrix, giving particular emphasis to new and renewable sources of energy and to the opportunities contained within the Clean Development Mechanisms, under the Kyoto Protocol. It should ensure energy availability to sustainably meet the requirements of national socio-economic development by undertaking the necessary actions to increase access to diversified energy sources in a sustainable way, contributing to the welfare of the population and the country‘s socio-economic development. The strategy recognizes accelerating electrification efforts, giving priority to rural areas, through the expansion and intensification of the national grid, the utilization of Renewables, the optimization of low cost solutions, and the introduction of measures which will ensure productive and efficient use of electricity (as low consumption/high efficiency light bulbs). The GoM aims to support regional integration and reflects in its national legal framework the best practices in environmental protection. Mozambique has its own Oil Law and Electricity Law. A Regulation defines the licensing of electricity installations, another Regulation establishes the competencies and procedures regarding concessioning of production, transmission, distribution and marketing of electricity, as well as its importation and exportation. Other regulations establish the norms for the national grid, the instructions for CNELEC and its regulatory functions, and the Technical Unit for Implementation of Hydroelectric Projects (UTIP). Based on the new Energy Sector Strategy with its specific subsectors of Electrical Energy and New and Renewable Energies, as well as the Energy Strategic Plan 2009 – 2013, the GoM has prepared a comprehensive 5-year plan for energy development and access. In the current government’s 5-year plan (2015-2019) increased access to electricity appears as one of the strategic objectives. Mozambique’s target is to provide electricity access to 50% of the population by 2023. Rural electrification is planned to be increased using both the national grid and household solar systems. A special focus lies on the electrification of health centres through PV solutions. Also the construction of 12 mini hydropower plants is foreseen.&nbsp;The 5-year plan does not make any mention of biomass related energy issues.<br />
  
The revised Energy Strategy aims to align Mozambique with best international practices for efficient energy utilization, raising awareness amongst its citizens about good environmental practices, diversifying the energy supply matrix, giving particular emphasis to new and renewable sources of energy and to the opportunities contained within the Clean Development Mechanisms, under the Kyoto Protocol. It should ensure energy availability to sustainably meet the requirements of national socio-economic development by undertaking the necessary actions to increase access to diversified energy sources in a sustainable way, contributing to the welfare of the population and the country‘s socio-economic development. The strategy recognizes accelerating electrification efforts, giving priority to rural areas, through the expansion and intensification of the national grid, the utilization of Renewables, the optimization of low cost solutions, and the introduction of measures which will ensure productive and efficient use of electricity (as low consumption/high efficiency light bulbs). The GoM aims to support regional integration and reflects in its national legal framework the best practices in environmental protection. Mozambique has its own Oil Law and Electricity Law. A Regulation defines the licensing of electricity installations, another Regulation establishes the competencies and procedures regarding concessioning of production, transmission, distribution and marketing of electricity, as well as its importation and exportation. Other regulations establish the norms for the national grid, the instructions for CNELEC and its regulatory functions, and the Technical Unit for Implementation of Hydroelectric Projects (UTIP). Based on the new Energy Sector Strategy with its specific subsectors of Electrical Energy and New and Renewable Energies, as well as the Energy Strategic Plan 2009 – 2013, the GoM has prepared a comprehensive 5-year plan for energy development and access. ENDEV MOZAMBIQUE is fully aligned and consistent with this plan, with PARPA and with the new sector strategy.
+
* [[Policy Framework and Energy Access Strategies in Mozambique|'''For more information, see this article.''']]<br />
  
ENDEV MOZAMBIQUE will specifically support:
+
[[Mozambique Energy Situation#toc|►Go to Top]]
#grid densification by scaling-up electricity connections in peri-urban areas;
 
#promote market development for renewable energy technologies for household lighting and social infrastructure
 
#technology transfer and capacity building for the main implementing partners mainly, but not exclusively of the private sector.
 
  
<br/>
+
=Institutional Set-up in the Energy Sector=
  
= Institutional Set-up in the Energy Sector =
+
<u>The public sector is represented by:</u>
  
<u>The public sector is represented by:</u>
+
*The [http://www.mireme.gov.mz/ Ministry of Mineral Resources and Energy (MIREME) FUNAE] was created in 2015 after elections by merging the former Ministry of Energy with the Ministry of Mineral Resources. The Ministry consists of four directorates: Mines and Geology, Hydrocarbons and Fuels, Energy and Planning and Cooperation. In the energy sector MIREME is responsible for national energy planning and policy formulation and for overseeing the operation and development of the energy sector. MIREME is represented in the provinces through the Provincial Directorates of Mineral Resources and Energy (DIPREME).<br />
*The Ministry of Energy (MoE) is responsible for national energy planning and policy formulation and for overseeing the operation and development of the energy sector. The MoE is composed of three main thematic areas (Power Sector, Renewables and Liquid Fuels) and a central services management group. The MoE is represented in the provinces through the Provincial Directorates of Mineral Resources and Energy (DIPREME).
 
 
*Electricidade de Moçambique (EdM), is a vertically-integrated, government-owned electric utility responsible for generation, transmission and distribution of electricity in the national grid. EdM buys most of its power supply (apr. 400 MW) from Hidroelectrica de Cahora Bassa (HCB), owner and operator of the Cahora Bassa hydro power plant on the Zambezi (2,075 MW). The GoM owns 82 percent of HCB which operates as an Independent Power Producer (IPP) The bulk of the electricity generated at HCB is exported to South Africa, with a small amount to Zimbabwe. EdM sells any excess electricity on the Southern Africa Short Term Energy Market. The Mozambique transmission grid is currently interconnected with South Africa, Zimbabwe and Swaziland.
 
*Electricidade de Moçambique (EdM), is a vertically-integrated, government-owned electric utility responsible for generation, transmission and distribution of electricity in the national grid. EdM buys most of its power supply (apr. 400 MW) from Hidroelectrica de Cahora Bassa (HCB), owner and operator of the Cahora Bassa hydro power plant on the Zambezi (2,075 MW). The GoM owns 82 percent of HCB which operates as an Independent Power Producer (IPP) The bulk of the electricity generated at HCB is exported to South Africa, with a small amount to Zimbabwe. EdM sells any excess electricity on the Southern Africa Short Term Energy Market. The Mozambique transmission grid is currently interconnected with South Africa, Zimbabwe and Swaziland.
*The Fundo Nacional de Energia (FUNAE) was established in 1997 as a public institution to promote rural electrification and rural access to modern energy services, in a sustainable manner, and as a contributor to economic and social development in the country. Since its establishment FUNAE has implemented numerous projects using renewable energy technologies to electrify schools, clinics and communities.
+
*The [http://www.funae.co.mz/index.php?option=com_content&view=article&id=46&Itemid=27&lang=en Fundo Nacional de Energia] (FUNAE) was established in 1997 as a public institution to promote rural electrification and rural access to modern energy services, in a sustainable manner, and as a contributor to economic and social development in the country. Since its establishment FUNAE has implemented numerous projects using renewable energy technologies to electrify schools, clinics and communities.<br />
 
*The Conselho Nacional de Electricidade (CNELEC) was re-established as an independent advisory regulatory body for the electricity sector in early 2008 with support from the World Bank Energy Reform and Access Project (ERAP). CNELEC was instructed to give its highest priority to an evaluation of EDM‘s performance under its Performance Contract with the GoM. This Performance Contract covers the years 2007 to 2009 and sets out the goals and indicators to be met annually by EDM and GoM. CNELEC was also instructed to conduct a review of the current methodology used by EDM in setting tariffs. In performing the review of EDM‘s performance, the directive instructed CNELEC to conduct its review in an open and transparent manner with public hearings in several locations throughout the country.
 
*The Conselho Nacional de Electricidade (CNELEC) was re-established as an independent advisory regulatory body for the electricity sector in early 2008 with support from the World Bank Energy Reform and Access Project (ERAP). CNELEC was instructed to give its highest priority to an evaluation of EDM‘s performance under its Performance Contract with the GoM. This Performance Contract covers the years 2007 to 2009 and sets out the goals and indicators to be met annually by EDM and GoM. CNELEC was also instructed to conduct a review of the current methodology used by EDM in setting tariffs. In performing the review of EDM‘s performance, the directive instructed CNELEC to conduct its review in an open and transparent manner with public hearings in several locations throughout the country.
 +
*The private sector is represented by various licensed private enterprises which participate in the grid extension and household connection works of EdM and private enterprises for the provision and installation of PV products, often situated exclusively in the capital Maputo. A microfinance sector with banks and NGOs is active throughout the country but often exclusively restricted to the province and/or district capitals. The NGO sector is characterized by relatively weak institutional profiles and technical specialisation, as well as weak implementation structures and technical competences.
  
<br/>
+
[[Institutional Framework in Mozambique|'''For more information, see this article.''']]
 
 
The private sector is represented by various licensed private enterprises which participate in the grid extension and household connection works of EdM and private enterprises for the provision and installation of PV products, often situated exclusively in the capital Maputo. A microfinance sector with banks and NGOs is active throughout the country but often exclusively restricted to the province and/or district capitals. The NGO sector is characterized by relatively weak institutional profiles and technical specialisation, as well as weak implementation structures and technical competences.
 
  
<br/>
+
[[Mozambique Energy Situation#toc|►Go to Top]]
  
= Activities of Other Donors =
+
=Major Donor Activities=
  
The World Bank is one of the main donors in the energy sector in Mozambique. Since July 2007, it has served as co-chair with the GoM on the ―Energy Sector Working Group‖ that was established within the framework of the Paris Declaration. The Bank is in preparation of the second phase of the '''Energy Reform and Access Project (ERAP)''', which will now be called '''Energy Development and Access Programme (EDAP)''' The proposed project will help establish the necessary operational framework for increasing electricity access to un-electrified areas nationally in a sustainable and programmatic manner, aiming at mainstreaming a sector-wide approach (SWAp) by establishing a comprehensive donor partnership framework for coordinated and sustained financing of investment and capacity strengthening aligned with national priorities and procedures (WB, ADB, ADF, OFID, BADEA, IsDB, Kuweit Fund) With Norway, the World Bank is also co-financing the Mozambique- Malawi Transmission Interconnection Project (cancelled medio 2010) and the Mozambique Regional Transmission Backbone Project. Sweden is engaged together with co-financing of Norway and Denmark in rural electrification (grid extension and household connections) in Sofala, Manica, Tete and Niassa Provinces. Norway is financing rural electrification in Cabo Delgado and grid extension in Gurue - Cuamba – Lichinga and Namacurra – Pebane. '''Technical assistance (TA)''' and capacity development for EdM in mega project development for power generation, as well as for the MoE are delivered by Norway and Sweden. Sweden also is embarking on the rehabilitation of the hydro power stations in Mavuzi and Chicamba. The '''European Commission (EC)''' is financing rural electrification in Cabo Delgado, Tete and Sofala with EdM, PV electrification in rural areas with FUNAE and capacity building in energy planning and management for the MoE. DFID is giving TA on Biofuels to the National Directorate of Renewable Energy of the MoE.
+
Currently, different international actors such as the EnDev, SNV, GIZ, World Bank, JICA, USAID are active in the energy supporting different policies as well as RE projects<ref>Affrica-EU Renewable Energy Cooperation Program: Solar Energy Investment Opportunities in MozambiquefckLRfckLR</ref>.&nbsp;
  
<br/>
+
* [[Energy Access Programmes in Mozambique|'''For a list of all donor energy programmes, click here.''']]
 +
* [[Development Actors in Mozambique|'''For a list of all development actors, click here.''']]
  
Belgium has signed a contract with FUNAE in September 2010, with the following summary of activities planned for.
+
'''Past Programmes'''
  
This program will focus on off-grid energy systems, based on renewable energy resources (hydraulic, solar and wind), in remote rural areas where no grid connection is foreseen within the next five years.
+
Since July 2007, the World Bank has served as co-chair with the GoM on the ―Energy Sector Working Group‖ that was established within the framework of the Paris Declaration. The Bank is in preparation of the second phase of the '''Energy Reform and Access Project (ERAP)''', which will now be called '''Energy Development and Access Programme (EDAP).''' The proposed project will help establish the necessary operational framework for increasing electricity access to un-electrified areas nationally in a sustainable and programmatic manner, aiming at mainstreaming a sector-wide approach (SWAp) by establishing a comprehensive donor partnership framework for coordinated and sustained financing of investment and capacity strengthening aligned with national priorities and procedures (WB, ADB, ADF, OFID, BADEA, IsDB, Kuweit Fund) With Norway, the World Bank is also co-financing the Mozambique- Malawi Transmission Interconnection Project (cancelled medio 2010) and the Mozambique Regional Transmission Backbone Project. Sweden is engaged together with co-financing of Norway and Denmark in rural electrification (grid extension and household connections) in Sofala, Manica, Tete and Niassa Provinces. Norway is financing rural electrification in Cabo Delgado and grid extension in Gurue - Cuamba – Lichinga and Namacurra – Pebane. '''Technical assistance (TA)''' and capacity development for EdM in mega project development for power generation, as well as for the MoE are delivered by Norway and Sweden. Sweden also is embarking on the rehabilitation of the hydro power stations in Mavuzi and Chicamba. The '''European Commission (EC)''' is financing rural electrification in Cabo Delgado, Tete and Sofala with EdM, PV electrification in rural areas with FUNAE and capacity building in energy planning and management for the MoE. DFID is giving TA on Biofuels to the National Directorate of Renewable Energy of the MoE.
*The program will finance, on grant basis, electrification systems for community infrastructures such as administrative buildings, schools, health centres, water pumping devices and public lighting
 
*Renewable energy installations for private use (household, shops or small enterprises) will be stimulated by subsidies (investment funds) and soft loans through micro-finance systems. This will make the investment more economically feasible for rural people.
 
  
In order to increase the sustainability of the renewable energy installations, the program will also provide a computerized asset management system and technical assistance focussed on capacity building through training initiatives, research and development. Two long-term international experts (one with technical and one with a socio-economical profile) will join and cooperate with the FUNAE staff during the implementation of the project.<br/>The total budget of the program has been established at 18.000.000 EUR, composed of a 15.000.000 EUR contribution of the Belgian Government and an additional contribution of the Mozambican Government estimated at 120.000.000 MTN (equivalent to 3.000.000 EUR) for payment of all taxes and duties, personnel, staff and office space provided by FUNAE.<br/>Considering the large area of the country and the dispersed population in the rural areas, a geographical concentration and/or clustering of the activities will be essential for the follow-up and the cost-effectiveness of the activities. As the provinces of Manica, Tete, Zambezia and Nyassa have a high potential for small hydropower, the possibility of concentrating activities in these four provinces will be investigated.
+
In April 2019,&nbsp;World Bank approved a USD 82 million energy grant to Mozambique to increase access to electricity in the peri-urban and rural areas, expand the existing grid network and promote the use of off-grid energy solutions in areas where grid expansion is not feasible.This project is also supported by a USD 55 million Multi-Donor Trust Fund, also admisitered by the World bank. The project will focus on the northern provinces of Niassa, Nampula and Cabo Delgado, and Zambezia and Sofala in the centre of the country. It also aims to contribute towards the Mozambique government’s Energy for All project.
  
<br/>
+
Belgium had an energy program with the Ministry of Energy trough FUNAE, from September 2010 up to December 2016. The program focused on off-grid energy systems, based on renewable energy resources (hydraulic, solar and wind), in remote rural areas where no grid connection is foreseen within the next five years. The program was financed, on grant basis, electrification systems for community infrastructures such as administrative buildings, schools, health centres, water pumping devices and public lighting. In 2017 a new program has to start, worth a grant of 12 million euro, with the same partner FUNAE, including renewable energy installations for private use (household, shops or small enterprises) to be stimulated by subsidies (investment funds) and soft loans through micro-finance systems. In order to increase the sustainability of the renewable energy installations, the program will also provide a computerized asset management system and technical assistance focused on capacity building through training initiatives, research and development.&nbsp;
  
ENDEV MOZAMBIQUE plans to coordinate its activities with the new EDAP and Belgian Programmes in close cooperation with FUNAE and government structures both central and in the province, as there will be several common intervention areas as grid densification, PV electrification of social infrastructure and market development of PV systems for households. The ENDEV MOZAMBIQUE activities are in line with the capacity development needs of the implementing partners of the private sector, mainly NGOs, communities and local entrepreneurs, which will receive business development services and will be trained on the job during the implementation of the activities in the PV and hydro power components.<br/>
+
[[Mozambique Energy Situation#toc|►Go to Top]]
  
<br/>
+
=Further Information=
  
= Further Information =
+
*[[Mozambique Off-grid Knowledge Hub]]
 +
*[[Mozambique Solar Hub]]
 +
*[[Mozambique Nano/Mini Grid Hub]]
 +
*[[Mozambique Cooking Energy Hub]]
 +
*[[Mozambique Productive Uses of Energy Hub]]
 +
*USAID Power Africa: [https://www.usaid.gov/sites/default/files/documents/1860/Mozambique_-_November_2018_Country_Fact_Sheet.pdf Mozambique Factsheet]
  
= References =
+
=References=
  
 
<references />
 
<references />
  
[[Category:Mozambique]]
+
[[Mozambique Energy Situation#toc|►Go to Top]]
[[Category:Country_Energy_Situation]]
 

Latest revision as of 08:17, 21 July 2022

Mozambique
Flag of Mozambique.png
Location _______.png

Capital:

Maputo

Region:

Coordinates:

25.9500° S, 32.5833° E

Total Area (km²): It includes a country's total area, including areas under inland bodies of water and some coastal waterways.

799,380

Population: It is based on the de facto definition of population, which counts all residents regardless of legal status or citizenship--except for refugees not permanently settled in the country of asylum, who are generally considered part of the population of their country of origin.

33,635,160 (2023)

Rural Population (% of total population): It refers to people living in rural areas as defined by national statistical offices. It is calculated as the difference between total population and urban population.

61 (2023)

GDP (current US$): It is the sum of gross value added by all resident producers in the economy plus any product taxes and minus any subsidies not included in the value of the products. It is calculated without making deductions for depreciation of fabricated assets or for depletion and degradation of natural resources.

20,954,220,984 (2023)

GDP Per Capita (current US$): It is gross domestic product divided by midyear population

622.99 (2023)

Access to Electricity (% of population): It is the percentage of population with access to electricity.

33.20 (2022)

Energy Imports Net (% of energy use): It is estimated as energy use less production, both measured in oil equivalents. A negative value indicates that the country is a net exporter. Energy use refers to use of primary energy before transformation to other end-use fuels, which is equal to indigenous production plus imports and stock changes, minus exports and fuels supplied to ships and aircraft engaged in international transport.

-54.60 (2014)

Fossil Fuel Energy Consumption (% of total): It comprises coal, oil, petroleum, and natural gas products.

12.62 (2014)

Source: World Bank





Introduction

The Republic of Mozambique is located on the south-eastern coast of Africa and has a surface area of 801,590 square kilometres. It is bordered by South Africa, Swaziland, Zimbabwe, Zambia, Malawi, Tanzania, and separated by the Indian Ocean from Madagascar. The country is divided into ten provinces, and a provincial capital city (see Map: Provinces in Mozambique). It is one of the poorest countries in the world, and the 7th poorest in Africa with a GDP per capita of USD 1281 (2019), a total GDP of USD 14.96 billion (2019), and an annual GDP growth of 3.11% (2018).
Mozambique has undertaken significant efforts in recent years to electrify the country. The electrification rate has increased from 5% in 2001 to 29% in 2019[1]. In 2022, it increased to 44%[2] from 34% in 2020.[3] Access to electricity, however, remains low and is mainly focused on urban areas. In 2019, 72% of the urban population had access to electricity compared to 5% of the rural population. [4]This imbalance represents an important challenge to achieving country-wide electrification by 2030, considering that the vast majority (63% in 2019) of Mozambique’s population lives in rural areas.[5]

The national grid including off grid facilities is claimed to reach some 30 % of the country today in terms of numbers of people with potential access to the grid (not connected). Many district capitals depend on expensive and often unreliable power generation with diesel generators. Outside these towns, the situation is even worse. The overwhelming majority of rural households, most rural schools, health centres and administrative posts are without access to electricity. Lack of mechanical power is a bottleneck for the rural subsistence agricultural production, as grain producers have to walk long distances to the nearest milling facility. Rural areas lack electricity for lighting, radio and communication in households and for refrigeration in small commerce. Nevertheless, many rural household spend a considerable share of their income for modern energy in the form of kerosene or batteries (€ 4–5 per month). Lack of access to electricity restricts the local population’s opportunities for income-generating activities.
The energy sector is key to the country's economy already today, since energy exports make up a large share of total foreign exchange earnings. Moreover, the availability of cheap electricity is one of the main reasons for the significant foreign direct investment in energy-intensive industries in Mozambique. Energy exports (hydropower, coal, gas and possibly oil) and projects to cover the growing domestic electricity demand will play an increasingly important role in the years to come. The liberalisation of the power sector initiated in 1997 allowed for third parties from the private sector to enter the power generation, transmission and distribution markets without impressive results so far (2012).
►Go to Top

Potentials

Mozambique has considerable energy resources with an estimated hydropower potential of 12,000 MW and also gas reserves (estimated at reaching 700 billion cubic metres) and vast coal reserves (estimated to reach 140 million TJ) with the potential of generating approx. 500 MW and 5,000 MW respectively. Regarding solar, it has about 23 TW capacity, out of which 2.7 GW could easily be harnessed[6].

A National Policy and Strategy for Biofuels was approved in February 2009 which focuses on ethanol from sugarcane and sorghum and coconut and jatropha for biodiesel. This policy has led to hundreds of millions of dollars in investment plans in ethanol and biodiesel in Mozambique. In October 2007 ethanol plant in Mozambique received US$510 million in support from the UK. However, the actual on-the-ground activity is unclear and production has yet to commence. Biofuels are not readily available in the country and export details are also not available[7].

Click here to read more about the RE potential in Mozambique.

►Go to Top

Renewable Energy Potential

Resource Availability Total Potential
Wind Along the coasts (Speeds between 4 - 6 m/s at 80m height)
4.5 GW[8]
Solar 4.5-7 kWh/m2/day 2.7 GW[9]
Hydro 12 GW (1 GW in small installations up to 10 MW) 12 000 MW
Biomass 100's of MW (Big biogas potential) 2 GW biomass potential[10]

Click here to read more about the RE potential in Mozambique.

►Go to Top

Electricity Generation and Consumption

Mozambique has a total installed capacity of 2,780 MW (2020). The projections for 2030 from the Power Sector Master Plan show an expected increase in the total installed capacity to 6,001 MW. Hydropower is the dominating electricity source with 2,189 MW, 79% of the total energy mix, followed by 442 MW from gas (16%), 108 MW from heavy fuel oil (HFO) (4%) and 41 MW from solar (1%) (2020).[11]

There are six working hydropower stations across the country. The largest hydroelectric plant is located in the Tete province and is operated by Hidroeléctrica de Cahora Bassa (HCB).[12] HCB is responsible for most of the hydroelectric generation, with a capacity of 2,075 MW. In 2014, it supplied up to 88% of the power consumed in Mozambique.[13] Due to the low electricity demand (peak demand in 2014 was estimated at only 831 MW) resulting from scarce energy access in Mozambique, the majority of the generation from HCB is exported to South Africa. Smaller shares are exported to Zimbabwe and Botswana. [5]

The table below shows the most recent energy indicators reported by the IEA. In 2018, the total primary energy supply was 10.43 Mtoe, from a total of 20.23 Mtoe produced that year. Final electricity consumption was only 13.63 TWh, however, this number has increased drastically by more than 2000% since 1990.[14]

Table: Mozambique’s key energy indicators
Energy production 20.23 Mtoe
Total primary energy supply 10.43 Mtoe
Total electricity consumption 13.63 TWh
Electricity consumption per capita 0.5 MWh

For more information about generation and consumption of electricity in Mozambique, please click here.

►Go to Top


Noteworthy Trends

Despite its large renewable energy resources, the country energy sector focus is on large hydro projects in the Zambezi Basin (i.e. Mphanda Nkuwa) to produce power for export to South Africa and for industry. Mozambique relies heavily on the export of commercial electricity to South Africa from the Cahora Bassa dam on the Zambezi River to generate foreign exchange income.

The two immediate projects are the 850 MW (nominal) expansion of the Cahora Bassa dam and the controversial Mphanda Nkuwa dam (2500 MW). See table below.

Project Name Type of Project

Size

Comments

CB North Bank Hydropower expansion

850 to 1300 additional MW

Detailed feasibility study is underway

Mphanda Nkuwa Hydropower

2500 MW

Env. + Soc. Impact Study underway

Massingir Hydropower

40 MW

EDM managed

Lurio Hydropower

120 MW


Majawa Hydropower

25 MW


Malema Hydropower

60 MW


Moatize Coal fired power plant

1500 MW

IES is the developer

Temane Combined Cycle natural gas fired power plant

300-400 MW

On May 2022, USAID and DFC signed an agreement with EDM to provide a loan of USD 200 m to support the design, construction and operation of the project. [15]


As a result of March 2009 Government policy, the biofuels sector is receiving hundreds of millions of dollars in investment (sugar – ethanol, jatropha --- biodiesel). However, production has yet to commence and there is considerable controversy about transparency and food vs. energy.

►Go to Top

Market Situation

The market situation for photovoltaic (PV) and hydro power technologies and services is still in early stages.The off-grid market is identified to be around 4 million households, creating an opportunity for not only electrification but also boosting the local economy. UNEP has estimated that for every 10,000 off-grid houses connection, 30 jobs are created by renewable energy. The jobs could be created in the local manufacturing, distribution and maintenance. Apart from electrification, off-grid can also support other productive uses of electricity especially in the agriculture sector (solar pumping)[16].

The private sector is underdeveloped in Mozambique and until 2018, only 25 business were either active or were inclined to enter the market in near future. These businesses are mostly dependent on public tender and donor initiatives. However, the informal off-grid solar products market is thriving in Mozambique with products imported from South Africa, Tanzania or China. This could be because Mozambique has a higher import duty and VAT on PV and ICS as compared to other sub-Saharan countries such as Ethiopia, Ghana or Tanzania. These products in the informal market enter via informal channels and do not pay the import taxes[17].

The Improved Cookstove (ICS) market in Mozambique is small and is categorized by mostly donor/NGOs initiatives. Up until March 2020, there were 10-15 companies supplying ICS stoves (charcoal and fuelwood) in the Mozambique market compared to 4 ICS suppliers in 2018. Some of the companies include: MozCarbon, ENI,  ICEMA LDA, Sogepal and Pamoja Moçambique. For the ICS supply chain, two-step distribution chain i.e. producers to consumers is most common but many companies are also expanding the distribution chain to reach consumers outside the capital city, Maputo.[18]

For green mini grid, the tendering process is similar as big energy projects and this increases the complexity for obtaining a concession contact, especially for local businesses. However, the government is promoting mini-grids for public spaces such as health centres, schools and water pumping for community and agricultural purposes[6]. There is also a new regulation which has provisions for green mini-grids but it is still unclear how they will be implemented on the ground. [19]

In the case of micro and pico hydro there are no readily available products available in the country which makes prices prohibitive for communities and individual households. However there is a good potential for local manufacture of water wheels and pico turbines, although the market is still very limited and therefore local services tend to be rather expensive.

In its first phase, ENDEV MOZAMBIQUE started pioneer activities in the local manufacture of water wheels for upgrading traditional maize mills and the manufacture of pico turbines with most promising results. Therefore it is envisaged to upscale micro/pico hydro power activities sustainably on a local level with an appropriate and cost effective approach for technical capacity building, technology transfer and market development.

The market for PV is divided into steadily growing local market spots and mainly capital based PV providers working with directly imported equipment for government projects funded by donors. The local market is efficient and reliable but informal, with low quality products of Chinese origin coming mainly from RSA. Market actors are lacking technical knowledge. In parallel to the dissemination of products from the local market ENDEV MOZAMBIQUE has started designing an energy efficient compact small solar home system (SSHS) with a local enterprise. In the case of PV for household lighting, technical capacity building, technology transfer and market development is envisaged within a Public Private Partnership (PPP) measure with German enterprises and higher quality products.

In addition to the overarching need for developing the countries extensive energy resources (hydro, coal, gas and biomass) for both domestic and regional consumption the main challenges in the power sector in Mozambique are:

  • Ensuring that affordable electricity supply is available to meet the rapidly growing domestic demand. In the near term, this will involve the continued extension of the grid with a focus on loss reduction and intensification of the grid,
  • Reaching the vast areas of the country beyond the national grid managed by EDM. The GoM is committed to supporting decentralized electrification of social infrastructure (rural schools, clinics and administrative offices) and to increase access to modern energy services to villages and rural enterprises through PV systems, micro/pico-hydro schemes, modern biomass energy, and other Renewable Energy Technologies (RETs),
  • Ensuring that power shortages do not become a constraint on economic growth. Several GoM proposed generation and transmission ―mega-projects‖ will address sufficiency and security of supply for the medium to long-term,
  • Institutional strengthening and capacity development of the main sector public institutions (MoE, EdM, FUNAE and CNELEC) but also of the private sector composed of NGOs, MFIs, and local enterprises working with RETs, in order to improve their respective performance, governance and effectiveness.

►Go to Top

Key Problems of the Energy Sector

Power Africa states that Mozambique's energy sector's most challenging issues are as follows[20]:

  • Public Finances/Macro-economic issues
  • Lacking credible utility and cost-reflective tariff
  • Lack of strong, transparent regulator

Policy Framework, Laws and Regulations

The legal framework relating to energy in Mozambique is composed of a variety of policies, strategies and regulations, the most important ones being the energy strategy (2009), the policy for the development of new and renewable energies 2011-2025 (2011), the strategy of the conversation and sustainable use of biomass energy (2013), the strategy of biofuels (2009), the regulation of biofuels and their mixture and the regulation that established the feed in tariff for new and renewable energies - REFIT (2014).

Within PARPA (PRSP), the programme for reduction and alleviation of absolute poverty, the GoM has been granting high priority to efforts to increase access to electricity for the population. Within the PARPA II the GoM has affirmed the critical role of the energy sector in reducing poverty. Adequate and equitable access to energy resources and services such as the provision of energy services to households, rural schools, administrative offices, and hospitals in rural areas is defined as a key driver of growth and poverty alleviation. The energy-related goals set in the PARPA are being operationalised by GoM through a number of strategies, investments and studies that have been prepared or are under way. The PARPA II (§507ff) outlines a programme for the energy sector, which entails: Electrification, Liquid Fuels, Renewable Energy, and Intersectoral Collaboration.

The Energy Policy approved March 3rd 1998 by the Council of Ministers under Resolution 5/98 established with the following objectives among others relevant for ENDEV MOZAMBIQUE.:

  • Guarantee reliable supply of energy, at lowest possible cost, in order to meet present demand and future levels based on economic development trajectories,
  • Increase the energy options available for household consumption,
  • Secure better efficiency in energy utilization,
  • Promote the development of environmentally friendly conversion technologies, namely hydro, solar, wind and biomass,
  • Promote competitive, dynamic and more efficient entrepreneurs.

In March 2009 the Policy for Renewables was defined with the following objectives among others with relevance for ENDEV MOZAMBIQUE:

  • Increase the access to modern energy services of high quality and accessible prices,
  • Reduce poverty and contribute to the Millennium Development Goals,
  • Contribute to the generation of local and national income and employment.

The revised Energy Strategy aims to align Mozambique with best international practices for efficient energy utilization, raising awareness amongst its citizens about good environmental practices, diversifying the energy supply matrix, giving particular emphasis to new and renewable sources of energy and to the opportunities contained within the Clean Development Mechanisms, under the Kyoto Protocol. It should ensure energy availability to sustainably meet the requirements of national socio-economic development by undertaking the necessary actions to increase access to diversified energy sources in a sustainable way, contributing to the welfare of the population and the country‘s socio-economic development. The strategy recognizes accelerating electrification efforts, giving priority to rural areas, through the expansion and intensification of the national grid, the utilization of Renewables, the optimization of low cost solutions, and the introduction of measures which will ensure productive and efficient use of electricity (as low consumption/high efficiency light bulbs). The GoM aims to support regional integration and reflects in its national legal framework the best practices in environmental protection. Mozambique has its own Oil Law and Electricity Law. A Regulation defines the licensing of electricity installations, another Regulation establishes the competencies and procedures regarding concessioning of production, transmission, distribution and marketing of electricity, as well as its importation and exportation. Other regulations establish the norms for the national grid, the instructions for CNELEC and its regulatory functions, and the Technical Unit for Implementation of Hydroelectric Projects (UTIP). Based on the new Energy Sector Strategy with its specific subsectors of Electrical Energy and New and Renewable Energies, as well as the Energy Strategic Plan 2009 – 2013, the GoM has prepared a comprehensive 5-year plan for energy development and access. In the current government’s 5-year plan (2015-2019) increased access to electricity appears as one of the strategic objectives. Mozambique’s target is to provide electricity access to 50% of the population by 2023. Rural electrification is planned to be increased using both the national grid and household solar systems. A special focus lies on the electrification of health centres through PV solutions. Also the construction of 12 mini hydropower plants is foreseen. The 5-year plan does not make any mention of biomass related energy issues.

►Go to Top

Institutional Set-up in the Energy Sector

The public sector is represented by:

  • The Ministry of Mineral Resources and Energy (MIREME) FUNAE was created in 2015 after elections by merging the former Ministry of Energy with the Ministry of Mineral Resources. The Ministry consists of four directorates: Mines and Geology, Hydrocarbons and Fuels, Energy and Planning and Cooperation. In the energy sector MIREME is responsible for national energy planning and policy formulation and for overseeing the operation and development of the energy sector. MIREME is represented in the provinces through the Provincial Directorates of Mineral Resources and Energy (DIPREME).
  • Electricidade de Moçambique (EdM), is a vertically-integrated, government-owned electric utility responsible for generation, transmission and distribution of electricity in the national grid. EdM buys most of its power supply (apr. 400 MW) from Hidroelectrica de Cahora Bassa (HCB), owner and operator of the Cahora Bassa hydro power plant on the Zambezi (2,075 MW). The GoM owns 82 percent of HCB which operates as an Independent Power Producer (IPP) The bulk of the electricity generated at HCB is exported to South Africa, with a small amount to Zimbabwe. EdM sells any excess electricity on the Southern Africa Short Term Energy Market. The Mozambique transmission grid is currently interconnected with South Africa, Zimbabwe and Swaziland.
  • The Fundo Nacional de Energia (FUNAE) was established in 1997 as a public institution to promote rural electrification and rural access to modern energy services, in a sustainable manner, and as a contributor to economic and social development in the country. Since its establishment FUNAE has implemented numerous projects using renewable energy technologies to electrify schools, clinics and communities.
  • The Conselho Nacional de Electricidade (CNELEC) was re-established as an independent advisory regulatory body for the electricity sector in early 2008 with support from the World Bank Energy Reform and Access Project (ERAP). CNELEC was instructed to give its highest priority to an evaluation of EDM‘s performance under its Performance Contract with the GoM. This Performance Contract covers the years 2007 to 2009 and sets out the goals and indicators to be met annually by EDM and GoM. CNELEC was also instructed to conduct a review of the current methodology used by EDM in setting tariffs. In performing the review of EDM‘s performance, the directive instructed CNELEC to conduct its review in an open and transparent manner with public hearings in several locations throughout the country.
  • The private sector is represented by various licensed private enterprises which participate in the grid extension and household connection works of EdM and private enterprises for the provision and installation of PV products, often situated exclusively in the capital Maputo. A microfinance sector with banks and NGOs is active throughout the country but often exclusively restricted to the province and/or district capitals. The NGO sector is characterized by relatively weak institutional profiles and technical specialisation, as well as weak implementation structures and technical competences.

For more information, see this article.

►Go to Top

Major Donor Activities

Currently, different international actors such as the EnDev, SNV, GIZ, World Bank, JICA, USAID are active in the energy supporting different policies as well as RE projects[21]

Past Programmes

Since July 2007, the World Bank has served as co-chair with the GoM on the ―Energy Sector Working Group‖ that was established within the framework of the Paris Declaration. The Bank is in preparation of the second phase of the Energy Reform and Access Project (ERAP), which will now be called Energy Development and Access Programme (EDAP). The proposed project will help establish the necessary operational framework for increasing electricity access to un-electrified areas nationally in a sustainable and programmatic manner, aiming at mainstreaming a sector-wide approach (SWAp) by establishing a comprehensive donor partnership framework for coordinated and sustained financing of investment and capacity strengthening aligned with national priorities and procedures (WB, ADB, ADF, OFID, BADEA, IsDB, Kuweit Fund) With Norway, the World Bank is also co-financing the Mozambique- Malawi Transmission Interconnection Project (cancelled medio 2010) and the Mozambique Regional Transmission Backbone Project. Sweden is engaged together with co-financing of Norway and Denmark in rural electrification (grid extension and household connections) in Sofala, Manica, Tete and Niassa Provinces. Norway is financing rural electrification in Cabo Delgado and grid extension in Gurue - Cuamba – Lichinga and Namacurra – Pebane. Technical assistance (TA) and capacity development for EdM in mega project development for power generation, as well as for the MoE are delivered by Norway and Sweden. Sweden also is embarking on the rehabilitation of the hydro power stations in Mavuzi and Chicamba. The European Commission (EC) is financing rural electrification in Cabo Delgado, Tete and Sofala with EdM, PV electrification in rural areas with FUNAE and capacity building in energy planning and management for the MoE. DFID is giving TA on Biofuels to the National Directorate of Renewable Energy of the MoE.

In April 2019, World Bank approved a USD 82 million energy grant to Mozambique to increase access to electricity in the peri-urban and rural areas, expand the existing grid network and promote the use of off-grid energy solutions in areas where grid expansion is not feasible.This project is also supported by a USD 55 million Multi-Donor Trust Fund, also admisitered by the World bank. The project will focus on the northern provinces of Niassa, Nampula and Cabo Delgado, and Zambezia and Sofala in the centre of the country. It also aims to contribute towards the Mozambique government’s Energy for All project.

Belgium had an energy program with the Ministry of Energy trough FUNAE, from September 2010 up to December 2016. The program focused on off-grid energy systems, based on renewable energy resources (hydraulic, solar and wind), in remote rural areas where no grid connection is foreseen within the next five years. The program was financed, on grant basis, electrification systems for community infrastructures such as administrative buildings, schools, health centres, water pumping devices and public lighting. In 2017 a new program has to start, worth a grant of 12 million euro, with the same partner FUNAE, including renewable energy installations for private use (household, shops or small enterprises) to be stimulated by subsidies (investment funds) and soft loans through micro-finance systems. In order to increase the sustainability of the renewable energy installations, the program will also provide a computerized asset management system and technical assistance focused on capacity building through training initiatives, research and development. 

►Go to Top

Further Information

References

  1. World Bank, ‘Mozambique | Data’. https://data.worldbank.org/indicator/EG.ELC.ACCS.UR.ZS?locations=MZ
  2. S.Excia Eng. Carlos Zacarias - Ministro dos Recursos Minerais e Energia (MIREME). 2022. CDD Just Energy Transition. https://www.youtube.com/watch?v=3GphYhRJq50
  3. Renewables in Mozambique (2021):https://www.lerenovaveis.org/contents/lerpublication/aler_mar2021_resumo-renovaveis-em-mocambique-2021.pdf
  4. World Bank, ‘Mozambique | Data’. https://data.worldbank.org/indicator/EG.ELC.ACCS.UR.ZS?locations=MZ
  5. 5.0 5.1 Mozambique: Energy and the Poor’, K. Naidoo, C. Loots, 2020, https://sun-connect-news.org/fileadmin/DATEIEN/Dateien/New/2021-01-29_UNDP-UNCDF-Mozambique-Energy-and-the-Poor.pdf.
  6. 6.0 6.1 BERF (2016). Business environment constraints in Mozambique’s Renewable Energy Sector: Solar PV Systems and Improved Cook Stoves, Business Environment Reform Facility, UK Department of International Development. https://assets.publishing.service.gov.uk/media/5c76b459ed915d3547d50a07/Final_BERF-Mozambique-Renewable-Energy-8th-Dec2016.pdf
  7. The biofuels sector, and especially the biodiesel sector, has attracted considerable investment. Hundreds of millions of dollars of investment has been made. Much of this has been in the sugar sector which is growing rapidly. At least 7 biodiesel/jatropha plantations have been set up with poor -- and controversial – results. (see Justica Ambiental!/Uniao Nacional de Camponeses, Jatropha: A Socio-economic pitfall for Mozambique. August 2009. http://ictsd.org/i/news/biores/45169/
  8. Recurso Eólico’, accessed 24 June 2021, https://www.funae.co.mz/index.php/pt/recursos/recurso-eolico
  9. Pranab Baruah and Brendan Coleman, ‘Country Brief: Mozambique Off-Grid Solar Power in Mozambique: Opportunities for Universal Energy Access and Barriers to Private Sector Participation’, n.d., 26.
  10. GET.invest, ‘Renewable Energy Potential – GET.Invest’, accessed 21 April 2021, https://www.get-invest.eu/market-information/mozambique/renewable-energy-potential/
  11. Aler_mar2021_resumo-Renovaveis-Em-Mocambique-2021.Pdf’, accessed 23 April 2021, https://www.lerenovaveis.org/contents/lerpublication/aler_mar2021_resumo-renovaveis-em-mocambique-2021.pdf
  12. Mozambique: Energy and the Poor’, K. Naidoo, C. Loots, 2020, https://sun-connect-news.org/fileadmin/DATEIEN/Dateien/New/2021-01-29_UNDP-UNCDF-Mozambique-Energy-and-the-Poor.pdf.
  13. EDM, Integrated Master Plan 2018-2043,https://www.edm.co.mz/en/document/reports/integrated-master-plan-2018-2043
  14. IEA, ‘Mozambique - Countries & Regions’ https://www.iea.org/countries/mozambique
  15. US backs Mozambique’s energy security projects: https://www.esi-africa.com/us-backs-mozambiques-energy-security-projects/
  16. Global Green Growth Institute (2017). Country Brief: Mozambique. Off-grid solar power in Mozambique: Opportunities for universal energy access and barriers to private sector participation.fckLRfckLRhttps://sun-connect-news.org/fileadmin/DATEIEN/Dateien/New/Country-Brief-Mozambique.pdf
  17. Lighting Global (2018):Off-Grid Solar Market Assessment in MozambiquefckLRfckLR https://www.lightingafrica.org/wp-content/uploads/2019/07/Mozambique_off-grid-assessment.pdf
  18. EnDev, ‘Workshop Energy Market Scorecard Mozambique ICS 2020’
  19. https://amer.org.mz/wp-content/uploads/2021/12/Decreto-nA%CC%82o-93-2021-de-10-de-Dezembro-de-2021-Aprova-o-Regulamento-de-Acesso-A%CC%83-Energia-nas-Zonas-Fora-da-Rede.pdf
  20. Power Africa. (2018). Mozambique Factsheet. Retrieved from: https://www.usaid.gov/sites/default/files/documents/1860/Mozambique_-_November_2018_Country_Fact_Sheet.pdf
  21. Affrica-EU Renewable Energy Cooperation Program: Solar Energy Investment Opportunities in MozambiquefckLRfckLR

►Go to Top