Category:Micro Hydro
From energypedia
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
Pages in category "Micro Hydro"
The following 91 pages are in this category, out of 91 total.
C
D
E
- End-Use Load Monitoring of a Community Microgrid in Rural East Malaysia: Challenges Faced During a Period of Rapid Development
- EnDev Indonesia - Project Overview 2013
- EnDev Indonesia Site Criteria Checklist for Solar / Micro Hydro Power Plants
- EnDev Indonesia Village Managment Team Guidance Poster 2013
- Environment Assessment and Watershed Action Planning Related to Micro Hydro Power Projects (MHPs)
- Environment Assessment Related to Micro-hydro Power (MHP) Projects in Ethiopia
G
H
I
- Impact Report on Micro Hydro Power (MHP) Sites - supported by EnDev I in Indonesia (May 2011)
- Indonesia - Productive Use of Energy through Cooperative
- Indonesia - Small Hydropower
- Indonesia: Operational Status of Rural MHP and PV Mini-grids
- Indonesian Micro-hydro Power Sites: Survey on Key Performance Indicators (2012)
- Integrated Energy Services Project - Economic and Financial Analysis
- Integration of Gender Issues
M
- Making Difference : Ensuring Sustainability
- MHP El Behuco
- MHP El Plan
- MHP El Roblar
- MHP La Laguna
- MHP Malacatoya
- MHP Ocote Tuma
- Micro Hydro - Operation and Maintenance
- Micro Hydro Power (MHP) - Ethiopia, Ererte
- Micro Hydro Power (MHP) - Ethiopia, Gobecho I
- Micro Hydro Power (MHP) - Ethiopia, Gobecho II
- Micro Hydro Power (MHP) - Ethiopia, Hagara Sodicha
- Micro Hydro Power (MHP) - Indonesia, Impact on Sustainability (Comparative Study)
- Micro Hydro Power (MHP) - Pros and Cons
- Micro Hydro Power (MHP) - Socio-economic Development
- Micro Hydro Power (MHP) Haeusleberg Farm
- Micro Hydro Power (MHP) Manuals
- Micro Hydro Power (MHP) Plant - Turbine Types
- Micro Hydro Power (MHP) Plants
- Micro Hydro Power (MHP) Troubleshooting Poster for Operators in Indonesia
- Micro Hydro Power (MHP) Troubleshooting Poster for Operators in Indonesia (GIZ Indonesia, September 2012)
- Micro Hydro Power - Monitoring
- Micro Hydro Power in Ethiopia - Analysis and Lessons Learned
- Micro Hydropower (MHP) - Off-grid to On-grid
- Micro Hydropower (MHP) Peru - Local Management and Governance Working Model
- Micro Hydropower Debt Fund Component - EnDev Nepal
- Micro-hydro Power (MHP) Projects - Mitigation and Intervention Techniques - Agro-forestry, Forage Development and Forestry
- Micro-hydro Power (MHP) Projects - Mitigation and Intervention Techniques - Flood Control and Improved Drainage
- Micro-hydro Power (MHP) Projects - Mitigation and Intervention Techniques - Gully Control
- Micro-hydro Power (MHP) Projects - Mitigation and Intervention Techniques - Water Harvesting
- Micro-Hydro Power - Analysis of Costs
- Micro-hydro Power - Catchment Area Management Poster (EnDev Indonesia 2013)
- Micro-Hydro Power Institutions
- Micro-Hydropower Plants - Estimation of Management Costs
- Mini-Grid Webinar Series 2019 - 3rd Webinar
- Mini-Grid Webinar Series 2019 - 4th Webinar
- Mitigation and Intervention Techniques Related to Micro-hydro Power (MHP) Projects
P
S
T
U
Media in category "Micro Hydro"
The following 86 files are in this category, out of 86 total.
- 1 DRD Dr. Soe Soe Ohn.pptx ; 0 bytes
- 1 KWRIntl Keith Rabin.pdf 3,300 × 2,550, 17 pages; 0 bytes
- 130410 EnDev Indonesia - PUE and MHP - Pilot Project Findings.pdf 3,000 × 2,250, 18 pages; 1.75 MB
- 130429 MHP Troubleshooting Poster.pptx ; 0 bytes
- 130621EnDev Indonesia Project Overview Poster.jpg 9,360 × 6,620; 0 bytes
- 130621EnDev Indonesia Project Overview Poster.pdf 14,040 × 9,929; 0 bytes
- 130724 EnDev2 Impact on Sustainability - A Comparative Study (EnDev Indonesia 2013).pdf 2,480 × 3,508, 43 pages; 1.86 MB
- 130730 MHP Troubleshooting Poster (GIZ EnDev Indonesia 2013).JPG 880 × 622; 0 bytes
- 130730 PV-VP Troubleshooting Poster (GIZ EnDev Indonesia 2013).JPG 885 × 626; 0 bytes
- 131113 Village Managment Teams for Off-grid Rural Electrification - Guidance Poster (EnDev Indonesia 2013) 01.pdf 14,040 × 9,929, 3 pages; 0 bytes
- 2 Dr. Hla Myo Aung (DRI, MOST).pptx ; 0 bytes
- 2 Ippei Kitahara Asia Air Survey.pptx ; 0 bytes
- 2 Kohji Iwakami UNESCAP.pptx ; 0 bytes
- 2 MOST DRI Dr Thi Thi Soe.ppt ; 0 bytes
- 2014 ENDEV Laporan Peningkatan Kapasitas Usaha PLTMH.pdf 2,480 × 3,508, 45 pages; 0 bytes
- 2015 EnDev Dokumentasi Pengembangan Ekonomi Produktif KUKM.pdf 2,480 × 3,508, 43 pages; 0 bytes
- 3 U Zaw Min SHPAM Presentation.pptx ; 0 bytes
- 3 Yolanda Hanna ASEAN RESP.pptx ; 0 bytes
- 4 Divyam Nagpal IRENA.pptx ; 0 bytes
- A Community Managed Micro Hydro Connected Mini Grid in Nepal Shakya.pdf 3,000 × 2,250, 14 pages; 0 bytes
- Advancing Mini-hydropower in Myanmar Towards SE4ALL.pdf 2,550 × 3,300, 14 pages; 0 bytes
- Africa Felou Hydroelectric Project E&FA.pdf 2,550 × 3,300, 82 pages; 6.19 MB
- Best Practice Guideline.pdf 2,480 × 3,508, 102 pages; 0 bytes
- Bore-hole-overhead-tank.jpg 2,560 × 1,920; 0 bytes
- Brief site assessment.pdf 2,479 × 3,508, 2 pages; 51 KB
- CBRES - Lessons from the Field.pdf 2,550 × 3,300, 226 pages; 4.5 MB
- Credit Support requirement for Micro Hydro Projects.jpg 386 × 240; 0 bytes
- EN-TRAINING MANUAL ON SCOUTING OF SITES FOR PICO AND MICRO HYDRO POWER SCHEMES-GTZ-AMES; et. al..pdf 2,550 × 3,300, 13 pages; 1.48 MB
- EnDev Indonesia - Catchment Area Management Poster (English).jpg 14,043 × 9,933; 0 bytes
- EnDev Indonesia - Productive Use of Energy - Findings of Pilot Project (GIZ, 2013).pdf 2,480 × 3,506, 24 pages; 1.46 MB
- EnDev Indonesia Annual Report 2013 (GIZ 2014).pdf 2,152 × 3,032, 33 pages; 0 bytes
- EnDev Indonesia Annual Report 2014.pdf 2,480 × 3,508, 40 pages; 2.28 MB
- EnDev Indonesia KPI Figure 1-1.JPG 555 × 319; 28 KB
- EnDev Indonesia KPI Figure 1-2.JPG 545 × 315; 32 KB
- EnDev Indonesia KPI Figure 1-3.JPG 551 × 337; 33 KB
- EnDev Indonesia KPI Figure 1-4.JPG 861 × 431; 51 KB
- EnDev Indonesia KPI Figure 1-5.JPG 508 × 314; 30 KB
- EnDev Indonesia KPI Figure 1-6.JPG 494 × 355; 28 KB
- EnDev Indonesia KPI Figure 1-7.JPG 552 × 360; 36 KB
- EnDev Indonesia KPI Figure 1-8.JPG 549 × 312; 36 KB
- EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH.pdf 2,480 × 3,508, 3 pages; 0 bytes
- EnDev2 Indonesia Impact on Sustainability - cover image.jpg 1,024 × 768; 0 bytes
- EnDev2 Indonesia Impact on Sustainability - Graph data availability.jpg 830 × 487; 0 bytes
- EnDev2 Indonesia Impact on Sustainability - Graph sustainability scoring.jpg 565 × 306; 0 bytes
- Estudio de caso1.pdf 2,550 × 3,300, 16 pages; 0 bytes
- EXPERIENCIA DE ENDEV HO-NI EN REGULACIÓN ELECTRÓNICA PARA MCH.pdf 2,480 × 3,508, 12 pages; 0 bytes
- FAQ Grid Interconnection of MHP.docx ; 112 KB
- Generator Leku.jpg 632 × 626; 0 bytes
- GIZ Indonesia - MHP Troubleshooting Poster.jpg 869 × 606; 112 KB
- How MHP systems implemented under EnDev1 Indonesia are performing (November 2010) - GTZ Indonesia - November 2010.pdf 2,479 × 3,504, 47 pages; 3.81 MB
- HPNET Webinar-1 Opening-Discussant-Closing Slides 29MARCH2019.pdf 3,300 × 2,550, 19 pages; 0 bytes
- HYCOM GerhardFischer HPNET Webinar 28MAR2019.pdf 3,300 × 2,550, 30 pages; 7.2 MB
- Institutional Support for MHDF Loan Disbursement.jpg 566 × 353; 0 bytes
- MHDF loan Analysis.jpg 609 × 380; 0 bytes
- MHDF Process flowchart.jpg 645 × 268; 0 bytes
- MHP Indonesia Cost Effectiveness Analysis Report - World Bank Group - September 2012.pdf 2,479 × 3,508, 73 pages; 2.59 MB
- MHP Troubleshooting Poster (GIZ EnDev Indonesia 2013).JPG 880 × 622; 135 KB
- MHP Troubleshooting Poster for Indonesian MHP operators - September 2012.JPG 1,072 × 804; 453 KB
- MHP with 2 pulley system.jpg 1,155 × 834; 0 bytes
- MHPs supported under MHDF.jpg 624 × 460; 0 bytes
- Micro Hydro Power in Indonesia.pdf 3,000 × 2,250, 14 pages; 1.89 MB
- Micro Hydro Power Plant GIZ.JPG 1,330 × 723; 0 bytes
- Outil d 'analyse financière .xls ; 3.47 MB
- Pengembangan Ekonomi Produktif Koperasi berbasis Energi Terbarukan.pdf 2,480 × 3,508, 59 pages; 0 bytes
- Productive End Use of Micro Hydro Nepal KathmanduUniversity.pdf 3,000 × 2,250, 23 pages; 3.39 MB
- Promotion of Sustainable Use of Natural Resources and Local Economic Development in Honduras.pdf 2,480 × 3,508, 38 pages; 571 KB
- Ramgarh Case Study India.docx ; 8.14 MB
- Report MHP WS2010-final.pdf 2,479 × 3,508, 30 pages; 648 KB
- Report Operational Status Survey - EnDev Indonesia ed.Dec 2016.pdf 2,480 × 3,508, 37 pages; 2.06 MB
- River Leku.jpg 383 × 294; 0 bytes
- Sibat CREATech PPt presentation for HPNet Webinar 28MARCH2019 REV A.pdf 3,300 × 2,550, 12 pages; 0 bytes
- Site map of supported under MHDF.jpg 408 × 250; 0 bytes
- Survey on Key Performance Indicators for Indonesian Micro-hydro Power Sites - EnDev Indonesia - December 2012.pdf 2,480 × 3,508, 74 pages; 2.18 MB
- Sustinablity Survey Final Report.pdf 2,479 × 3,508, 73 pages; 0 bytes
- Terms of Reference for a Baseline Study at Murunda Rutsiro Project Site.pdf 2,550 × 3,300, 4 pages; 35 KB
- Village Management Team - Training Manual.pdf 2,480 × 3,508, 66 pages; 0 bytes